Chair of Subsurface Engineering (340)

Organisational unit: Chair

Research output

  1. 2017
  2. Published

    HOCHPRÄZISE SENSORIK ZUM ERMITTELN EINER MECHANISCHEN BELASTUNG EINES ABBAUWERKZEUGS EINER TUNNELBOHRMASCHINE

    Barwart, S. & Galler, R., 15 Feb 2017, IPC No. E21D 9/ 11 A I, Patent No. EP3129593, Priority date 2 Apr 2015, Priority No. WO2015EP57361

    Research output: Patent

  3. Published

    High-precision sensors for detecing a mechanical load of a mining tool of a tunnel boring machine

    S.巴尔瓦特 & R.加勒, R., 15 Feb 2017, IPC No. E21D 9/ 00 A I, Patent No. CN106414898, Priority date 2 Apr 2015, Priority No. WO2015EP57361

    Research output: Patent

  4. Published

    Sistema de sensores de alta precisión para detectar una carga mecánica de una herramienta excavadora de una tuneladora

    Barwart, S. & Galler, R., 20 Jan 2017, IPC No. E21D 9/ 00 A I, Patent No. CL2016002533, Priority date 8 Apr 2014, Priority No. DE201410105014

    Research output: Patent

  5. Published

    Evaluierung von 3D-BIM-Software für den Tunnelbau

    Löffler, M., 2017

    Research output: ThesisMaster's Thesis

  6. Published

    Excavation

    Galler, R., 2017, Rock Mechanics and Engineering. London, Vol. Volume 4. p. 3-50 48 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  7. Published
  8. Published
  9. Published
  10. Published

    Longterm stability of tunnels - Tests and results

    Galler, R. & Lorenz, S., 2017, Proceedings of the IV International Conference on Computational Methods in Tunneling and Subsurface Engineering: EURO:TUN 2017. Innsbruck, p. 25-30 6 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  11. Published

    Messung der Umweltbedingungen im Tunnelbau

    Müller, C., 2017

    Research output: ThesisMaster's Thesis