The ideal rig
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Standard
2015.
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - The ideal rig
AU - Fleischhacker, Markus
N1 - embargoed until null
PY - 2015
Y1 - 2015
N2 - Today’s drilling industry uses different types of rigs (multi-stand, rack and pinion) where different levels of mechanization help rig personnel with certain tasks such as making/breaking tubular among others. The question arising is which type of rig, in combination with the well to be drilled, and the processes taking place is most efficient. This specifically relates to material flows and workflows which take place. In this thesis the material flows (tubular, mud, material etc.) and work steps in dif-ferent – so called “work centres” will be analysed with the objective to optimize such flows and processes ending up with minimum waiting times and a continuous flow of material. The main reason is to avoid “Invisible Lost Time” and “Non Productive Time” par-ticularly for parallel processes; this makes it necessary to come up with a better rig layout, improved logistics and communication paths, as well as better interaction between crew members. Furthermore this thesis is aiming for a better rig organization. This means that the quality of the Tool Pushers job needs to be improved; therefore the concept of administration software for drilling rigs is presented.
AB - Today’s drilling industry uses different types of rigs (multi-stand, rack and pinion) where different levels of mechanization help rig personnel with certain tasks such as making/breaking tubular among others. The question arising is which type of rig, in combination with the well to be drilled, and the processes taking place is most efficient. This specifically relates to material flows and workflows which take place. In this thesis the material flows (tubular, mud, material etc.) and work steps in dif-ferent – so called “work centres” will be analysed with the objective to optimize such flows and processes ending up with minimum waiting times and a continuous flow of material. The main reason is to avoid “Invisible Lost Time” and “Non Productive Time” par-ticularly for parallel processes; this makes it necessary to come up with a better rig layout, improved logistics and communication paths, as well as better interaction between crew members. Furthermore this thesis is aiming for a better rig organization. This means that the quality of the Tool Pushers job needs to be improved; therefore the concept of administration software for drilling rigs is presented.
KW - Prozessoptimierung
KW - Bohrturm
KW - Materialfluss
KW - Arbeitsfluss
KW - ILT
KW - NPT
KW - process optimization
KW - drilling rig
KW - work flow
KW - material flow
KW - ILT
KW - NPT
M3 - Master's Thesis
ER -