Updated Prefeasibility Study of further Mining of Manganese Ore at the “Rudnik Mangana Bužim” Mine in Bosnia
Research output: Thesis › Master's Thesis
Standard
2023.
Research output: Thesis › Master's Thesis
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Updated Prefeasibility Study of further Mining of Manganese Ore at the “Rudnik Mangana Bužim” Mine in Bosnia
AU - Pilz, Georg
N1 - embargoed until 28-10-2024
PY - 2023
Y1 - 2023
N2 - The manganese deposit in Bužim has been mined since 1962. The exploitation stopped with the beginning of the Yugoslav wars. Several attempts to reopen the mine were made and potential investors expressed their interest in an updated pre-feasibility study. In this work a closer look on the project economics was taken, compared to previous reports and PFS.The main aim of this theses, to demonstrate the feasibility of further mining in Bužim, was achieved by taking the following work steps:•Data review, order and summary•Creation of the drillhole database•Creation of an updated orebody model•Creation of a block model•Classification of the deposit•Creation of a mine and pit design•Creation of a schedule for the mining and processing activities•Calculation of the profitability•Creation of a sensitivity analyses•Writing of a final reportWith the given assumptions it was concluded that the project can be conducted feasible and profitable after taking those steps. Some aspects need further investigation but are not considered a threat to the feasibility.
AB - The manganese deposit in Bužim has been mined since 1962. The exploitation stopped with the beginning of the Yugoslav wars. Several attempts to reopen the mine were made and potential investors expressed their interest in an updated pre-feasibility study. In this work a closer look on the project economics was taken, compared to previous reports and PFS.The main aim of this theses, to demonstrate the feasibility of further mining in Bužim, was achieved by taking the following work steps:•Data review, order and summary•Creation of the drillhole database•Creation of an updated orebody model•Creation of a block model•Classification of the deposit•Creation of a mine and pit design•Creation of a schedule for the mining and processing activities•Calculation of the profitability•Creation of a sensitivity analyses•Writing of a final reportWith the given assumptions it was concluded that the project can be conducted feasible and profitable after taking those steps. Some aspects need further investigation but are not considered a threat to the feasibility.
KW - Aktualisierte
KW - Vormachbarkeitsstudie
KW - PFS
KW - Rudnik
KW - Buzim
KW - Mangan
KW - Bosnien
KW - Bergwirtschaft
KW - Updated
KW - Pre-Feasability
KW - PFS
KW - Study
KW - Rudnik
KW - Buzim
KW - Manganese
KW - Bosnia
KW - Mining
KW - Economics
M3 - Master's Thesis
ER -