The Dump is the Target—A Reversed Mine Plan

Research output: Contribution to journalArticleResearch

Standard

The Dump is the Target—A Reversed Mine Plan. / Haindl, Angelika.
In: Berg- und hüttenmännische Monatshefte : BHM, Vol. 168.2023, No. 2, 16.01.2023, p. 71-74.

Research output: Contribution to journalArticleResearch

Vancouver

Haindl A. The Dump is the Target—A Reversed Mine Plan. Berg- und hüttenmännische Monatshefte : BHM. 2023 Jan 16;168.2023(2):71-74. Epub 2023 Jan 16. doi: 10.1007/s00501-022-01316-1

Bibtex - Download

@article{64b56b048a6441489865def0194b6c80,
title = "The Dump is the Target—A Reversed Mine Plan",
abstract = "Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.",
keywords = "dump design, mine design, mine plan, scheduling",
author = "Angelika Haindl",
year = "2023",
month = jan,
day = "16",
doi = "10.1007/s00501-022-01316-1",
language = "English",
volume = "168.2023",
pages = "71--74",
journal = "Berg- und h{\"u}ttenm{\"a}nnische Monatshefte : BHM",
issn = "0005-8912",
publisher = "Springer Wien",
number = "2",

}

RIS (suitable for import to EndNote) - Download

TY - JOUR

T1 - The Dump is the Target—A Reversed Mine Plan

AU - Haindl, Angelika

PY - 2023/1/16

Y1 - 2023/1/16

N2 - Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.

AB - Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.

KW - dump design

KW - mine design

KW - mine plan

KW - scheduling

U2 - 10.1007/s00501-022-01316-1

DO - 10.1007/s00501-022-01316-1

M3 - Article

VL - 168.2023

SP - 71

EP - 74

JO - Berg- und hüttenmännische Monatshefte : BHM

JF - Berg- und hüttenmännische Monatshefte : BHM

SN - 0005-8912

IS - 2

ER -