The Dump is the Target—A Reversed Mine Plan
Publikationen: Beitrag in Fachzeitschrift › Artikel › Forschung
Standard
in: Berg- und hüttenmännische Monatshefte : BHM, Jahrgang 168.2023, Nr. 2, 16.01.2023, S. 71-74.
Publikationen: Beitrag in Fachzeitschrift › Artikel › Forschung
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - JOUR
T1 - The Dump is the Target—A Reversed Mine Plan
AU - Haindl, Angelika
PY - 2023/1/16
Y1 - 2023/1/16
N2 - Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
AB - Mine plans usually need to consider the tonnage that must be stored in the dumping area and the machine hours required to place material there as a constraint. The Department of Mining Engineering and Mineral Economics was involved in a project, in which the whole mine planning procedure had to start with the dump. To start with a dump, formulating the targets for the mine plan did require some adaptation of the standard mine planning procedure. After a proper set-up, the schedule was updated several times to optimize it. In total, six complete scenarios have been created where the dam could be built in the simulation.
KW - dump design
KW - mine design
KW - mine plan
KW - scheduling
U2 - 10.1007/s00501-022-01316-1
DO - 10.1007/s00501-022-01316-1
M3 - Article
VL - 168.2023
SP - 71
EP - 74
JO - Berg- und hüttenmännische Monatshefte : BHM
JF - Berg- und hüttenmännische Monatshefte : BHM
SN - 0005-8912
IS - 2
ER -