Phase 5 Risk Area Evaluation - Yellowstone Mine (MT, USA)
Research output: Thesis › Master's Thesis
Standard
2015.
Research output: Thesis › Master's Thesis
Harvard
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Phase 5 Risk Area Evaluation - Yellowstone Mine (MT, USA)
AU - Pongratz, Karin
N1 - embargoed until null
PY - 2015
Y1 - 2015
N2 - As part of the project concerning the next mining phase (Phase 5) of the Yellowstone Mine operated by Imerys Talc North America, a small scale stability analysis was done. Therefore, bench by bench maps were created to show areas of concern by looking at faults, contacts, fracture orientation, rock characteristics, joint sets and other paths of failure. Special attention was given the volcanic unit and the Reef fault intersecting along the Phase 5 Ramp. For every potential risk, possible mitigation measures were looked at in detail for costs, installation and technical limits and compared to one another with a list of Pro's and Con's. Due to the small scale and the safe mine plan it is unlikely that severe failures will occur in Phase 5.
AB - As part of the project concerning the next mining phase (Phase 5) of the Yellowstone Mine operated by Imerys Talc North America, a small scale stability analysis was done. Therefore, bench by bench maps were created to show areas of concern by looking at faults, contacts, fracture orientation, rock characteristics, joint sets and other paths of failure. Special attention was given the volcanic unit and the Reef fault intersecting along the Phase 5 Ramp. For every potential risk, possible mitigation measures were looked at in detail for costs, installation and technical limits and compared to one another with a list of Pro's and Con's. Due to the small scale and the safe mine plan it is unlikely that severe failures will occur in Phase 5.
KW - talc
KW - Yellowstone mine
KW - Talk
KW - Yellowstone Mine
M3 - Master's Thesis
ER -