Phase 5 Risk Area Evaluation - Yellowstone Mine (MT, USA)

Publikationen: Thesis / Studienabschlussarbeiten und HabilitationsschriftenMasterarbeit

Standard

Phase 5 Risk Area Evaluation - Yellowstone Mine (MT, USA). / Pongratz, Karin.
2015.

Publikationen: Thesis / Studienabschlussarbeiten und HabilitationsschriftenMasterarbeit

Bibtex - Download

@mastersthesis{1cff4db9828f4df98c08e2177759ef92,
title = "Phase 5 Risk Area Evaluation - Yellowstone Mine (MT, USA)",
abstract = "As part of the project concerning the next mining phase (Phase 5) of the Yellowstone Mine operated by Imerys Talc North America, a small scale stability analysis was done. Therefore, bench by bench maps were created to show areas of concern by looking at faults, contacts, fracture orientation, rock characteristics, joint sets and other paths of failure. Special attention was given the volcanic unit and the Reef fault intersecting along the Phase 5 Ramp. For every potential risk, possible mitigation measures were looked at in detail for costs, installation and technical limits and compared to one another with a list of Pro's and Con's. Due to the small scale and the safe mine plan it is unlikely that severe failures will occur in Phase 5.",
keywords = "talc, Yellowstone mine, Talk, Yellowstone Mine",
author = "Karin Pongratz",
note = "embargoed until null",
year = "2015",
language = "English",

}

RIS (suitable for import to EndNote) - Download

TY - THES

T1 - Phase 5 Risk Area Evaluation - Yellowstone Mine (MT, USA)

AU - Pongratz, Karin

N1 - embargoed until null

PY - 2015

Y1 - 2015

N2 - As part of the project concerning the next mining phase (Phase 5) of the Yellowstone Mine operated by Imerys Talc North America, a small scale stability analysis was done. Therefore, bench by bench maps were created to show areas of concern by looking at faults, contacts, fracture orientation, rock characteristics, joint sets and other paths of failure. Special attention was given the volcanic unit and the Reef fault intersecting along the Phase 5 Ramp. For every potential risk, possible mitigation measures were looked at in detail for costs, installation and technical limits and compared to one another with a list of Pro's and Con's. Due to the small scale and the safe mine plan it is unlikely that severe failures will occur in Phase 5.

AB - As part of the project concerning the next mining phase (Phase 5) of the Yellowstone Mine operated by Imerys Talc North America, a small scale stability analysis was done. Therefore, bench by bench maps were created to show areas of concern by looking at faults, contacts, fracture orientation, rock characteristics, joint sets and other paths of failure. Special attention was given the volcanic unit and the Reef fault intersecting along the Phase 5 Ramp. For every potential risk, possible mitigation measures were looked at in detail for costs, installation and technical limits and compared to one another with a list of Pro's and Con's. Due to the small scale and the safe mine plan it is unlikely that severe failures will occur in Phase 5.

KW - talc

KW - Yellowstone mine

KW - Talk

KW - Yellowstone Mine

M3 - Master's Thesis

ER -