Evaluation and Risk Analysis of Open-Pit Mining Operations
Research output: Thesis › Master's Thesis
Standard
2019.
Research output: Thesis › Master's Thesis
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Evaluation and Risk Analysis of Open-Pit Mining Operations
AU - Pekol, Alexander
N1 - embargoed until 09-03-2024
PY - 2019
Y1 - 2019
N2 - Mining of raw materials is a process that consists of several stages. It starts with an order of a company or a private taker. For Greenfield projects, prospection and exploration must be done at first to investigate the mineral occurrence. If the resources are economical mineable, application of machinery has to be decided. The decision is primarily based on rock mass properties. In open-pit mining, material with high compressive strength is extracted by drilling and blasting and material with low compressive strength is extracted by e.g. a bucket wheel excavator. After drilling and blasting, material must be broken down into smaller pieces of rock using a crusher, so that it can be transported with conveyor belts. Most important influencing factors for crusher decision are compressive strength, clay content, moisture content, abrasiveness, amount of fines, and desired reduction ratio. Depending on sequence of mining, fixed, semi-fixed, semi-mobile, or mobile crusher stations can be applied. Compressive strength, tensile strength, cleavage, fracture behavior, and stickiness are the most significant influencing factors for bucket wheel excavator selection. Before manufacturing a bucket wheel excavator, investigation of material’s cutting resistance with a suitable test method and comparison of mine condition with condition of other mines is recommended. The waste removal and dumping associated with mining must be handled very well, so that the environmental impacts are as low as possible and to guarantee dump stability. Essential are dump foundation properties, design of dump, and construction of dump. Open-pit mining operations harbor risks which can lead to project delays, operation standstill, injury to personnel, damage to equipment, or negative impacts on the environment. Therefore, risk identification and prevention of risks is essential.
AB - Mining of raw materials is a process that consists of several stages. It starts with an order of a company or a private taker. For Greenfield projects, prospection and exploration must be done at first to investigate the mineral occurrence. If the resources are economical mineable, application of machinery has to be decided. The decision is primarily based on rock mass properties. In open-pit mining, material with high compressive strength is extracted by drilling and blasting and material with low compressive strength is extracted by e.g. a bucket wheel excavator. After drilling and blasting, material must be broken down into smaller pieces of rock using a crusher, so that it can be transported with conveyor belts. Most important influencing factors for crusher decision are compressive strength, clay content, moisture content, abrasiveness, amount of fines, and desired reduction ratio. Depending on sequence of mining, fixed, semi-fixed, semi-mobile, or mobile crusher stations can be applied. Compressive strength, tensile strength, cleavage, fracture behavior, and stickiness are the most significant influencing factors for bucket wheel excavator selection. Before manufacturing a bucket wheel excavator, investigation of material’s cutting resistance with a suitable test method and comparison of mine condition with condition of other mines is recommended. The waste removal and dumping associated with mining must be handled very well, so that the environmental impacts are as low as possible and to guarantee dump stability. Essential are dump foundation properties, design of dump, and construction of dump. Open-pit mining operations harbor risks which can lead to project delays, operation standstill, injury to personnel, damage to equipment, or negative impacts on the environment. Therefore, risk identification and prevention of risks is essential.
KW - Tagebau
KW - Schaufelradbagger
KW - IPCC
KW - Risiko
KW - Risikoanalyse
KW - Schnittkraft
KW - Grabkraft
KW - spezifischer Schneidwiderstand
KW - spezifischer Grabwiderstand
KW - Open-pit mining
KW - Bucket wheel excavator
KW - IPCC
KW - Risk
KW - Risk Analysis
KW - Cutting force
KW - Digging force
KW - Specific cutting resistance
KW - Specific digging resistance
U2 - 10.34901/mul.pub.2024.109
DO - 10.34901/mul.pub.2024.109
M3 - Master's Thesis
ER -