Chair of Subsurface Engineering (340)

Organisational unit: Chair

Research output

  1. Published

    Eisenerz ZaB Highway Tunnel

    Galler, R., Villeneuve, M. & Reinwald, B., 2020, IRONORE 2019: Project Review, Findings and Way Forward . p. 174-180 7 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  2. Published

    Embedded camera brings 3D mapping to tunnel boring machines

    Wenighofer, R., 2018, In: Vision Systems Design . 2018, January, p. 21-23 3 p.

    Research output: Contribution to journalArticleTransfer

  3. Published

    Empirical forecasting model to determine the strength development of shotcrete

    Hammer, A.-L., Thewes, M. & Galler, R., 2 Dec 2019, In: Geomechanics and tunnelling = Geomechanik und Tunnelbau. 12.2019, 6, p. 730-738 9 p.

    Research output: Contribution to journalArticleResearchpeer-review

  4. Published

    Engineering Geology Education in Australasia

    Villeneuve, M. C., 2019, IAEG/AEG Annual Meeting Proceedings, San Francisco, California, 2018—Volume 6. p. 45 50 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterEducationpeer-review

  5. Published
  6. Published

    Entwicklung einer Großversuchsanlage zur Bestimmung der Komprimierbarkeit von Spritzbeton

    Volderauer, C., Röck, R., Galler, R. & Pittino, G., 2011, In: Berg- und hüttenmännische Monatshefte : BHM. 156, p. 384-389

    Research output: Contribution to journalArticleResearchpeer-review

  7. Published
  8. Published

    Entwicklung einer In-Situ Langzeit-Druckversuchsanlage

    Geissbauer, J., 2006

    Research output: ThesisDiploma Thesis

  9. Published
  10. Published