Chair of Mining Engineering and Mineral Economics (200)
Organisational unit: Chair
581 - 590 out of 1,405Page size: 10
Research output
- 2016
- Published
COMPARISON OF VERTICAL PARALLEL LONG HOLE DRILLING VERSUS FAN DRILLING IN PRODUCTION STOPES IN VELARDENA MINE
Sanchez Fernandez, J. H., 2016Research output: Thesis › Master's Thesis (University Course)
- Published
Comparison between one staged and three stages crushing plant in a Copper Mine Operation
Ramos, A. L., 2016Research output: Thesis › Master's Thesis (University Course)
- Published
Comparison of State-of-the-Art Continuous and Batch Hauling Systems in the Development of Underground Coal Mines
Gross, T., 2016Research output: Thesis › Master's Thesis (University Course)
- Published
Continuous Improvement of Coal Clearance Systems in South African Coal Mines
Scobbie, J., 2016Research output: Thesis › Master's Thesis (University Course)
- Published
Crushing Plant Optimisation Using Total Cost of Ownership
Franzen, M., 2016Research output: Thesis › Master's Thesis (University Course)
- Published
Design considerations for pillar systems in deep mines
Wagner, H., Ladinig, T. & Blaha, H., 2016, In: Geomechanics and tunnelling = Geomechanik und Tunnelbau. 2016, 9Research output: Contribution to journal › Conference article
- Published
Determination of the Influence of Microwaves to the Hard Rock Characteristics and to the Cutting Process
CHEBENKO, L., 2016Research output: Thesis › Master's Thesis
- Published
- Published
Evaluation of Excavation Methods for Jarosite Disposal Areas within Europe
Griedl, P., 2016Research output: Thesis › Master's Thesis
- Published
Evaluation of a ‘Hybrid’ double roll crusher in DSO Iron Ore tertiary crushing application
Bilborough, E., 2016Research output: Thesis › Master's Thesis (University Course)