Practical validation of a new Desander model
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Standard
2019.
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Practical validation of a new Desander model
AU - Hartl, Manuel
N1 - no embargo
PY - 2019
Y1 - 2019
N2 - Throughout the last years, the oil industry has seen comparably low oil prices. Therefore, increased pressure is building on oil companies to increase their operational efficiency steadily. In terms of the production facilities and especially artificial lift systems, a key indicator enabling efficient operations is mean time between failure. Amongst the most damaging and lifetime shortening factors for artificial lift systems is sand production from the reservoir zone. Especially prone to damage by solid production are sucker rod pumps. Although ranking amongst the most efficient artificial lift methods, effects of sand production may shorten the mean time between failure for sucker rod pumps significantly, and are resulting in costly workover operations. Therefore, one goal for efficient oilfield operations is to limit sand production through sucker rod pumps. This thesis investigates a novel design approach in the form of a swirl desander. The proposed design is validated against existing models and an optimized design iteration determined. The tests are conducted under near field conditions at the Montanuniversitaets pump testing facility. The tests show that a perfectly designed swirl desander can achieve separation efficiencies of up to 95 percent. Furthermore, the optimal design proves robust to pump speed changes. The results are presented in the form of a sensitivity analysis, comparing the tested design variations and pump speeds. Overall, a combination of desander and gravel pack installations could promise an increase in mean time between failure for pumps affected by sand production.
AB - Throughout the last years, the oil industry has seen comparably low oil prices. Therefore, increased pressure is building on oil companies to increase their operational efficiency steadily. In terms of the production facilities and especially artificial lift systems, a key indicator enabling efficient operations is mean time between failure. Amongst the most damaging and lifetime shortening factors for artificial lift systems is sand production from the reservoir zone. Especially prone to damage by solid production are sucker rod pumps. Although ranking amongst the most efficient artificial lift methods, effects of sand production may shorten the mean time between failure for sucker rod pumps significantly, and are resulting in costly workover operations. Therefore, one goal for efficient oilfield operations is to limit sand production through sucker rod pumps. This thesis investigates a novel design approach in the form of a swirl desander. The proposed design is validated against existing models and an optimized design iteration determined. The tests are conducted under near field conditions at the Montanuniversitaets pump testing facility. The tests show that a perfectly designed swirl desander can achieve separation efficiencies of up to 95 percent. Furthermore, the optimal design proves robust to pump speed changes. The results are presented in the form of a sensitivity analysis, comparing the tested design variations and pump speeds. Overall, a combination of desander and gravel pack installations could promise an increase in mean time between failure for pumps affected by sand production.
KW - Tiefpumpen
KW - Gestängetiefpumpe
KW - Erdölproduktion
KW - Effizienz
KW - Sandproduktion
KW - Sandabscheider
KW - Artificial Lift Systems
KW - Desander
KW - Sand Production
KW - Production Engineering
KW - efficiency
M3 - Master's Thesis
ER -