Risk-based Maintenance for a holistic Asset Management System: A Model for a dynamic adaption of the Maintenance Strategy
Research output: Contribution to conference › Abstract › peer-review
Standard
Risk-based Maintenance for a holistic Asset Management System: A Model for a dynamic adaption of the Maintenance Strategy. / Passath, Theresa.
2019. Abstract from 9th IFAC Conference on Manufacturing Modelling, Management and Control, Berling, Germany.
2019. Abstract from 9th IFAC Conference on Manufacturing Modelling, Management and Control, Berling, Germany.
Research output: Contribution to conference › Abstract › peer-review
Harvard
Passath, T 2019, 'Risk-based Maintenance for a holistic Asset Management System: A Model for a dynamic adaption of the Maintenance Strategy', 9th IFAC Conference on Manufacturing Modelling, Management and Control, Berling, Germany, 28/08/18 - 30/08/19.
APA
Passath, T. (2019). Risk-based Maintenance for a holistic Asset Management System: A Model for a dynamic adaption of the Maintenance Strategy. Abstract from 9th IFAC Conference on Manufacturing Modelling, Management and Control, Berling, Germany.
Vancouver
Passath T. Risk-based Maintenance for a holistic Asset Management System: A Model for a dynamic adaption of the Maintenance Strategy. 2019. Abstract from 9th IFAC Conference on Manufacturing Modelling, Management and Control, Berling, Germany.
Author
Bibtex - Download
@conference{c38fb67b30ef4b9d89cb82042de56228,
title = "Risk-based Maintenance for a holistic Asset Management System: A Model for a dynamic adaption of the Maintenance Strategy",
author = "Theresa Passath",
year = "2019",
month = aug,
day = "28",
language = "English",
note = "9th IFAC Conference on Manufacturing Modelling, Management and Control ; Conference date: 28-08-2018 Through 30-08-2019",
}
RIS (suitable for import to EndNote) - Download
TY - CONF
T1 - Risk-based Maintenance for a holistic Asset Management System
T2 - 9th IFAC Conference on Manufacturing Modelling, Management and Control
AU - Passath, Theresa
PY - 2019/8/28
Y1 - 2019/8/28
M3 - Abstract
Y2 - 28 August 2018 through 30 August 2019
ER -