Optimum Well Design and Risk Mitigation for Efficient Use of Geothermal Energy in South East Europe Case Study
Research output: Thesis › Master's Thesis
Standard
2018.
Research output: Thesis › Master's Thesis
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Optimum Well Design and Risk Mitigation for Efficient Use of Geothermal Energy in South East Europe Case Study
AU - Juricic, Tin
N1 - no embargo
PY - 2018
Y1 - 2018
N2 - In drilling engineering, well design usually starts with input of reservoir engineer. Based on requested hole size, hole length trough the reservoir, and other requirements, drilling engineer (well designer) can start its work. Afterwards, drilling engineer is collecting all available data from other engineers (geologists, petrophysicist, geomechanical engineers, etc) in order to design a well which will serve it purpose. In this thesis, geothermal well design approach will be discussed, with emphasis on geothermal well design in SE Europe. This thesis will try to find main oversights that are usually made in exploration phase. Also, it will be discussed how new findings during drilling of exploration well have changed the approach to design of further development wells.
AB - In drilling engineering, well design usually starts with input of reservoir engineer. Based on requested hole size, hole length trough the reservoir, and other requirements, drilling engineer (well designer) can start its work. Afterwards, drilling engineer is collecting all available data from other engineers (geologists, petrophysicist, geomechanical engineers, etc) in order to design a well which will serve it purpose. In this thesis, geothermal well design approach will be discussed, with emphasis on geothermal well design in SE Europe. This thesis will try to find main oversights that are usually made in exploration phase. Also, it will be discussed how new findings during drilling of exploration well have changed the approach to design of further development wells.
KW - Geothermisch
KW - Borhung
KW - Risikominderung
KW - Optimierung
KW - Geothermal
KW - drilling
KW - risk mitigation
KW - optimization
M3 - Master's Thesis
ER -