Landfill Mining: Developing a comprehensive assessment method
Research output: Contribution to journal › Article › Research › peer-review
Standard
In: Waste management & research, Vol. 34.2016, No. 11, 11.2016, p. 1157-1163.
Research output: Contribution to journal › Article › Research › peer-review
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - JOUR
T1 - Landfill Mining
T2 - Developing a comprehensive assessment method
AU - Hermann, Robert
AU - Wolfsberger, Tanja
AU - Pomberger, Roland
AU - Sarc, Renato
PY - 2016/11
Y1 - 2016/11
N2 - In Austria, the first basic technological and economic examinations of mass-waste landfills with the purpose to recover secondary raw materials have been carried out by the 'LAMIS - Landfill Mining Österreich' pilot project. A main focus of its research, and the subject of this article, is the first conceptual design of a comprehensive assessment method for landfill mining plans, including not only monetary factors (like costs and proceeds) but also non-monetary ones, such as the concerns of adjoining owners or the environmental impact. Detailed reviews of references, the identification of influences and system boundaries to be included in planning landfill mining, several expert workshops and talks with landfill operators have been performed followed by a division of the whole assessment method into preliminary and main assessment. Preliminary assessment is carried out with a questionnaire to rate juridical feasibility, the risk and the expenditure of a landfill mining project. The results of this questionnaire are compiled in a portfolio chart that is used to recommend, or not, further assessment. If a detailed main assessment is recommended, defined economic criteria are rated by net present value calculations, while ecological and socio-economic criteria are examined in a utility analysis and then transferred into a utility-net present value chart. If this chart does not support making a definite statement on the feasibility of the project, the results must be further examined in a cost-effectiveness analysis. Here, the benefit of the particular landfill mining project per capital unit (utility-net present value ratio) is determined to make a final distinct statement on the general benefit of a landfill mining project.
AB - In Austria, the first basic technological and economic examinations of mass-waste landfills with the purpose to recover secondary raw materials have been carried out by the 'LAMIS - Landfill Mining Österreich' pilot project. A main focus of its research, and the subject of this article, is the first conceptual design of a comprehensive assessment method for landfill mining plans, including not only monetary factors (like costs and proceeds) but also non-monetary ones, such as the concerns of adjoining owners or the environmental impact. Detailed reviews of references, the identification of influences and system boundaries to be included in planning landfill mining, several expert workshops and talks with landfill operators have been performed followed by a division of the whole assessment method into preliminary and main assessment. Preliminary assessment is carried out with a questionnaire to rate juridical feasibility, the risk and the expenditure of a landfill mining project. The results of this questionnaire are compiled in a portfolio chart that is used to recommend, or not, further assessment. If a detailed main assessment is recommended, defined economic criteria are rated by net present value calculations, while ecological and socio-economic criteria are examined in a utility analysis and then transferred into a utility-net present value chart. If this chart does not support making a definite statement on the feasibility of the project, the results must be further examined in a cost-effectiveness analysis. Here, the benefit of the particular landfill mining project per capital unit (utility-net present value ratio) is determined to make a final distinct statement on the general benefit of a landfill mining project.
U2 - 10.1177/0734242X16657610
DO - 10.1177/0734242X16657610
M3 - Article
VL - 34.2016
SP - 1157
EP - 1163
JO - Waste management & research
JF - Waste management & research
SN - 0734-242X
IS - 11
ER -