In-situ test and numerical investigation on the long-term performance of deep borehole heat exchanger coupled heat pump heating system
Research output: Contribution to journal › Article › Research › peer-review
Standard
In: Case Studies in Thermal Engineering, Vol. 61, 104855, 09.2024.
Research output: Contribution to journal › Article › Research › peer-review
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - JOUR
T1 - In-situ test and numerical investigation on the long-term performance of deep borehole heat exchanger coupled heat pump heating system
AU - Liu, Bin
AU - Wang, Jiangfeng
AU - Li, Hongyan
AU - Liu, Jian
AU - Wang, Pengtao
AU - Cai, Wanlong
AU - Sun, Xianpeng
AU - Chen, Chaofan
N1 - Publisher Copyright: © 2024 The Author(s)
PY - 2024/9
Y1 - 2024/9
KW - Deep borehole heat exchanger (DBHE)
KW - Field test
KW - Heat pump
KW - Long-term sustainability
KW - Performance evaluation
UR - http://www.scopus.com/inward/record.url?scp=85199279059&partnerID=8YFLogxK
U2 - 10.1016/j.csite.2024.104855
DO - 10.1016/j.csite.2024.104855
M3 - Article
AN - SCOPUS:85199279059
VL - 61
JO - Case Studies in Thermal Engineering
JF - Case Studies in Thermal Engineering
SN - 2214-157X
M1 - 104855
ER -