Economic Efficiency Calculation of Flow Line Operations and Maintenance in Brown Fields

Research output: ThesisMaster's Thesis

Bibtex - Download

@mastersthesis{ad9e122bb47c48399bf1d03bcab0dfb4,
title = "Economic Efficiency Calculation of Flow Line Operations and Maintenance in Brown Fields",
abstract = "The overall goal concerning this thesis is to identify, if OMV is able to improve its operational costs by renewing the existing flow line system, which is subject to internal corrosion by water and the presence of CO2 and H2S in the gas phase. Failures of the flow line system cause production losses. These costs constitute a major cost item. A model has been set up which reflects the total costs of replacing flow lines. The cost models of this investment appraisal are based on two alternatives, keeping the existing flow line system and replacing it completely. A comparison analysis of the two models is carried out with established economic methods, whereby potential benefits are identified and analyzed. Furthermore, an investigation of the relationship between the input data and the target values has been performed with a probabilistic and a deterministic sensitivity analysis. This was done to answer the question, how the target value changes with variations of the input measures. The outcome of the investment appraisal and the sensitivity analysis provide the basis for the decision whether the investment, in a new flow line, should be undertaken or rejected.",
keywords = "flow line economic efficiency corrosion sensitivity analysis",
author = "Dragisa Pantelic",
note = "embargoed until 13-10-2013",
year = "2010",
language = "English",

}

RIS (suitable for import to EndNote) - Download

TY - THES

T1 - Economic Efficiency Calculation of Flow Line Operations and Maintenance in Brown Fields

AU - Pantelic, Dragisa

N1 - embargoed until 13-10-2013

PY - 2010

Y1 - 2010

N2 - The overall goal concerning this thesis is to identify, if OMV is able to improve its operational costs by renewing the existing flow line system, which is subject to internal corrosion by water and the presence of CO2 and H2S in the gas phase. Failures of the flow line system cause production losses. These costs constitute a major cost item. A model has been set up which reflects the total costs of replacing flow lines. The cost models of this investment appraisal are based on two alternatives, keeping the existing flow line system and replacing it completely. A comparison analysis of the two models is carried out with established economic methods, whereby potential benefits are identified and analyzed. Furthermore, an investigation of the relationship between the input data and the target values has been performed with a probabilistic and a deterministic sensitivity analysis. This was done to answer the question, how the target value changes with variations of the input measures. The outcome of the investment appraisal and the sensitivity analysis provide the basis for the decision whether the investment, in a new flow line, should be undertaken or rejected.

AB - The overall goal concerning this thesis is to identify, if OMV is able to improve its operational costs by renewing the existing flow line system, which is subject to internal corrosion by water and the presence of CO2 and H2S in the gas phase. Failures of the flow line system cause production losses. These costs constitute a major cost item. A model has been set up which reflects the total costs of replacing flow lines. The cost models of this investment appraisal are based on two alternatives, keeping the existing flow line system and replacing it completely. A comparison analysis of the two models is carried out with established economic methods, whereby potential benefits are identified and analyzed. Furthermore, an investigation of the relationship between the input data and the target values has been performed with a probabilistic and a deterministic sensitivity analysis. This was done to answer the question, how the target value changes with variations of the input measures. The outcome of the investment appraisal and the sensitivity analysis provide the basis for the decision whether the investment, in a new flow line, should be undertaken or rejected.

KW - flow line economic efficiency corrosion sensitivity analysis

M3 - Master's Thesis

ER -