Application of the ÖGG guideline for cost estimates on international megaprojects

Research output: Contribution to journalArticleResearch

Standard

Application of the ÖGG guideline for cost estimates on international megaprojects. / Spiegl, Markus; Galler, Robert; Sander, Philip.
In: Geomechanics and tunnelling = Geomechanik und Tunnelbau, Vol. 11.2018, No. 6, 05.12.2018, p. 680-692.

Research output: Contribution to journalArticleResearch

Bibtex - Download

@article{d782ca37ad84470fbcb619c5f25eeeea,
title = "Application of the {\"O}GG guideline for cost estimates on international megaprojects",
author = "Markus Spiegl and Robert Galler and Philip Sander",
year = "2018",
month = dec,
day = "5",
doi = "10.1002/geot.201800053",
language = "English",
volume = "11.2018",
pages = "680--692",
journal = "Geomechanics and tunnelling = Geomechanik und Tunnelbau",
issn = "1865-7362",
publisher = "Wiley-VCH ",
number = "6",

}

RIS (suitable for import to EndNote) - Download

TY - JOUR

T1 - Application of the ÖGG guideline for cost estimates on international megaprojects

AU - Spiegl, Markus

AU - Galler, Robert

AU - Sander, Philip

PY - 2018/12/5

Y1 - 2018/12/5

U2 - 10.1002/geot.201800053

DO - 10.1002/geot.201800053

M3 - Article

VL - 11.2018

SP - 680

EP - 692

JO - Geomechanics and tunnelling = Geomechanik und Tunnelbau

JF - Geomechanics and tunnelling = Geomechanik und Tunnelbau

SN - 1865-7362

IS - 6

ER -