Analysis of the drill and blast work in the Eclépens quarry of Holcim Switzerland with respect to blast vibrations
Research output: Thesis › Diploma Thesis
Standard
2005. 147 p.
Research output: Thesis › Diploma Thesis
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Analysis of the drill and blast work in the Eclépens quarry of Holcim Switzerland with respect to blast vibrations
AU - Schachinger, Tobias
N1 - no embargo
PY - 2005
Y1 - 2005
N2 - From March to June 2005, in the Eclépens quarry of the Holcim company (Holcim Suisse S.A.) drill and blast work was closely monitored, to find out whether there is a potential for the reduction of the blast vibration. In addition blast experiments were carried out where different tests were made in order to reduce the blast vibration level below 3 mm/s. Geological measurements show that geology seems to have no influence on a favoured blast vibration propagation in a certain direction. It is certain, that the development of the quarry towards Eclépens will cause higher blast vibrations in future. Measurements done with a theodolite proved a too high subdrilling of almost all production blasts, which can be additionally responsible for high blast vibrations. For normal production blasting in the quarry, a charge column with intermediate stemming and detonating cord over the whole drill hole length is used. The detonator is at the bottom of the drill hole. Several measures were tried to reduce blast vibrations: The introduction of decked charge columns with two delays lead to a clear reduction of the blast vibrations were clearly reduced. The orientation of blasts away from Eclépens (in direction Mormont) caused an additional reduction of the vibration level. Additional studies have to be done to further reduce the blast vibration level in the Eclépens quarry.
AB - From March to June 2005, in the Eclépens quarry of the Holcim company (Holcim Suisse S.A.) drill and blast work was closely monitored, to find out whether there is a potential for the reduction of the blast vibration. In addition blast experiments were carried out where different tests were made in order to reduce the blast vibration level below 3 mm/s. Geological measurements show that geology seems to have no influence on a favoured blast vibration propagation in a certain direction. It is certain, that the development of the quarry towards Eclépens will cause higher blast vibrations in future. Measurements done with a theodolite proved a too high subdrilling of almost all production blasts, which can be additionally responsible for high blast vibrations. For normal production blasting in the quarry, a charge column with intermediate stemming and detonating cord over the whole drill hole length is used. The detonator is at the bottom of the drill hole. Several measures were tried to reduce blast vibrations: The introduction of decked charge columns with two delays lead to a clear reduction of the blast vibrations were clearly reduced. The orientation of blasts away from Eclépens (in direction Mormont) caused an additional reduction of the vibration level. Additional studies have to be done to further reduce the blast vibration level in the Eclépens quarry.
KW - Eclépens
KW - Holcim
KW - blast vibration
KW - drilling and blasting work
KW - reduction
KW - Eclépens
KW - Sprengerschütterung
KW - Reduzierung
KW - Bohr- und Sprengarbeit
KW - Holcim
M3 - Diploma Thesis
ER -