An Energy Production Technology Assessment for Small and Medium Sized Projects
Research output: Thesis › Doctoral Thesis
Standard
2015.
Research output: Thesis › Doctoral Thesis
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - BOOK
T1 - An Energy Production Technology Assessment for Small and Medium Sized Projects
AU - Rabengruber, Alexander
N1 - no embargo
PY - 2015
Y1 - 2015
N2 - Changing political conditions, stakeholder conflicts, emission limits and many more are issues to consider before a new energy production plant is erected, especially in the European Union. Pure economical assessments cannot sufficiently cover those challenges. The field of application for existing multi-dimensional assessment tools are primarily large-scale electricity production plants. However, the importance of decentralised systems with combined use of heat and power rise. Thus, those assessment criteria can deviate and the correct consideration of the different energy products are important. Additionally, the inclusion of the stakeholders and estimation of their risk should not be neglected. The challenges lead to a new developed multi-dimensional assessment method, named ELiAs. ELiAs bases on a multi-criteria decision analysis and uses criteria from the economical, ecological, technical and socio-political dimensions. A new developed stakeholder weighting enables a categorisation of the stakeholders depending on their probability of exertion of influence, suggestibility and impact of stakeholder. Out of them preventive actions are possible. The model was tested for a realised geothermal application. An old oil well was re-equipped to a single-hole heat exchanger (SHE) to expand the useful lifetime of the well. The SHE project was compared with common gas condensing boilers. The ELiAs model detected the strengths and weaknesses of SHE and thus the need of research and the advantages towards the gas condensing boiler. Additionally, the results show the view of the stakeholders on the project and their importance of the individual criteria. However, the new assessment method will not replace existing, in the society and in companies firmly established assessment methods, but it can support decision makers. ELiAs analyses energy production technologies and their location in detail and faces often ignored flaws of such models.
AB - Changing political conditions, stakeholder conflicts, emission limits and many more are issues to consider before a new energy production plant is erected, especially in the European Union. Pure economical assessments cannot sufficiently cover those challenges. The field of application for existing multi-dimensional assessment tools are primarily large-scale electricity production plants. However, the importance of decentralised systems with combined use of heat and power rise. Thus, those assessment criteria can deviate and the correct consideration of the different energy products are important. Additionally, the inclusion of the stakeholders and estimation of their risk should not be neglected. The challenges lead to a new developed multi-dimensional assessment method, named ELiAs. ELiAs bases on a multi-criteria decision analysis and uses criteria from the economical, ecological, technical and socio-political dimensions. A new developed stakeholder weighting enables a categorisation of the stakeholders depending on their probability of exertion of influence, suggestibility and impact of stakeholder. Out of them preventive actions are possible. The model was tested for a realised geothermal application. An old oil well was re-equipped to a single-hole heat exchanger (SHE) to expand the useful lifetime of the well. The SHE project was compared with common gas condensing boilers. The ELiAs model detected the strengths and weaknesses of SHE and thus the need of research and the advantages towards the gas condensing boiler. Additionally, the results show the view of the stakeholders on the project and their importance of the individual criteria. However, the new assessment method will not replace existing, in the society and in companies firmly established assessment methods, but it can support decision makers. ELiAs analyses energy production technologies and their location in detail and faces often ignored flaws of such models.
KW - Energy
KW - Technology Assessment
KW - Multicriteria Desicion Analysis
KW - MCDA
KW - Stakeholder
KW - CHP
KW - combined heat and power
KW - geothermal heat
KW - bottom-hole heat exchanger
KW - economical
KW - ecological
KW - technical
KW - socio-political
KW - Energie
KW - Technoloieassessment
KW - Technologiebewertung
KW - Multikriterielle Entscheidungsanalyse
KW - MCDA
KW - Stakeholder
KW - KWK
KW - Kraft-Wärme-Kopplung
KW - Geothermie
KW - Bohrlochwärmetauscher
KW - ökonomisch
KW - ökologisch
KW - technisch
KW - sozio-politisch
KW - Bewertung
M3 - Doctoral Thesis
ER -