Asad Elmgerbi
11 - 20 out of 28Page size: 10
Research output
- Published
Detecting downhole drilling events EP 4 189 206 B1
Elmgerbi, A. (Inventor) & Thonhauser, G. (Inventor), 2025, Patent No. EP 4 189 206 B1Research output: Patent
- Published
Dynamic Drill-rate Test Approach Appplied to a Pre-salt Case Study
Roohi, A., Nascimento, A., Elmgerbi, A., Prohaska-Marchried, M., Thonhauser, G. & Hugo Mathias, M., 2015. 10 p.Research output: Contribution to conference › Paper
- E-pub ahead of print
Evaluating Multi-target Regression Framework for Dynamic Condition Prediction in Wellbore
Keshavarz, S., Elmgerbi, A., Vita, P. & Thonhauser, G., 23 Apr 2024, (E-pub ahead of print) In: The Arabian journal for science and engineering. 49.2024, June, p. 8953-8982 30 p.Research output: Contribution to journal › Article › Research › peer-review
- Published
Experimental approach for assessing filter-cake removability derived from reservoir drill-in fluids
Elmgerbi, A., Thonhauser, G., Fine, A., Borovina, A. & Hincapie , R., 8 Sept 2021.Research output: Contribution to conference › Paper › peer-review
- Published
General Analytical Solution for Estimating the Elastic Deformation of an Open Borehole Wall
Elmgerbi, A., Thonhauser, G., Prohaska-Marchried, M., Roohi, A. & Nascimento, A., 11 Feb 2016.Research output: Contribution to conference › Paper › peer-review
- Published
Graphical Analysis of Drilling Process by Integrating Sensor Data with Reporting Meta Data
Elmgerbi, A., 2012, 112 p.Research output: Thesis › Master's Thesis
- E-pub ahead of print
Holistic autonomous model for early detection of downhole drilling problems in real-time
Elmgerbi, A. & Thonhauser, G., 20 Jun 2022, (E-pub ahead of print) In: Process safety and environmental protection. 164.2022, August, p. 418-434 17 p.Research output: Contribution to journal › Article › Research › peer-review
- Published
IoT infrastructures for well control
Elmgerbi, A., 15 Jan 2025, In: Taylor & Francis.Research output: Contribution to journal › Article › Research › peer-review
- Published
‘Level‑off’ cement plugging method to cure lost circulation verified with case studies
Elmgerbi, A., Ashena, R., Ghalambor, A., Hekmatinia, A. & Mubashir, M., 29 Apr 2021.Research output: Contribution to conference › Paper › peer-review
- Published
Machine Learning Techniques Application for Real-Time Drilling Hydraulic Optimization
Elmgerbi, A., Thonhauser, G., Nascimento, A. & Chuykov, E., 21 Feb 2022.Research output: Contribution to conference › Paper