Chair of Subsurface Engineering (340)
Organisational unit: Chair
Research output
- 2010
- Published
The Austrian Concept of a fair contractual model for underground constructions
Galler, R., 2010, Proceedings of the Workshop "Use of TBM/Road Header in Underground Works-Issues and Challenges". p. 145-175Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
The convergence confinement method as an aid in the design of deep tunnels
Gschwandtner, G., 2010, Proceedings. p. ---Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Tunnelausbruchmaterial - hochwertiger Rohstoff
Galler, R., Resch, D., Ebner, F. & Lassnig, K., 2010, Abfallwirtschaft in der bergbaulichen Rohstoffgewinnung. Abfälle im Bergbaubetrieb und externe Abfälle.. p. 1-7Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Untersuchungen an Zementstein (Bohrlochzementation)
Pittino, G., 2010Research output: Book/Report › Commissioned report › Transfer › peer-review
- Published
Visualisierung der Stahlfasern im stahlfaserbewehrten Spritzbeton
Pittino, G., Geier, G. & Fritz, L., 2010.Research output: Contribution to conference › Poster › Research › peer-review
- 2009
- Published
A visual approach to efficient analysis and quantification of ductile iron and reinforced sprayed concrete
Fritz, L., Hadwiger, M., Geier, G., Pittino, G. & Gröller, E., 2009, IEEE Transactions on visualization and computer graphics, Volume 15, 6th issue.Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Arbeitsgruppe 19: Konventionelle Tunnelbauweisen/34. ITA/WTC-Jahrestagung 2008
Galler, R., 2009, In: Tunnel. p. 48-48Research output: Contribution to journal › Article › Research › peer-review
- Published
Beurteilung der Standsicherheit von Etagenwänden mittels probabilistischer Betrachtung von Kluftkörpern
Pittino, G., Galler, R. & Peyfuß, W., 2009, In: Berg- und hüttenmännische Monatshefte : BHM. 154, p. 585-591Research output: Contribution to journal › Article › Research › peer-review
- Published
Chapter 8. Modern Tunnelling: New Austrian Tunnelling Method (NATM)
Galler, R., 2009, Tuneli, Iskop i primarna podgrada - Tunnels, Excavation and primary support. p. 37-60Research output: Chapter in Book/Report/Conference proceeding › Chapter › Research
- Published
Contribution to the Design of the Systematic Bolting of Rock in Subsurface Construction
Kainrath-Reumayer, S. & Galler, R., 2009, Computational Methods in Tunnelling. EURO:TUN 2009. p. 313-320Research output: Chapter in Book/Report/Conference proceeding › Conference contribution