Chair of Subsurface Engineering (340)

Organisational unit: Chair

Research output

  1. Published
  2. Published
  3. Published

    Rohrschirm 4PPB-Test-Aufbau

    Pittino, G., Lamprecht, A. & Hosp, M., 2014.

    Research output: Contribution to conferencePosterResearchpeer-review

  4. Published

    Roofex bolt and its application in tunnelling by dealing with high stress ground conditions.

    Galler, R., Gschwandtner, G. & Doucet, C., 2011, World Tunnel Congress 2011 - Proceedings. p. 200-200

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  5. Published
  6. Published

    SafeMine PhD-Programme - Educating the Mine Health and Safety Workforce of Tomorrow

    Hutwalker, A., Binder, A., Langefeld, O., Galler, R., Johansson, J., Weimer, L., Braun, T. & Lottermoser, B., 2018, In: Mining Report. 2018, 5, p. 400-405 6 p.

    Research output: Contribution to journalArticleResearch

  7. Published
  8. Published

    Sanierung eines Lehnentunnels durch Veränderung des Bergwasserspiegels - Varianten und Ausführung

    Pittino, G. & Golser, J., 2004,

    ISRM Regional Symposium EUROCK 2004 & 53rd Geomechanics Colloquy

    .
    p. 361-366

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  9. Published

    Schachtlogistik beim maschinellen Schachtabteufen

    Schmidbauer, J., 2014

    Research output: ThesisMaster's Thesis

  10. Published

    Schaltvorrichtung zum Schalten einer elektrischen Verbindung, Energiespeichersystem für ein Fahrzeug sowie Verfahren zum Schalten einer elektrischen Verbindung

    Greilich, A. (Inventor), Galler, R. (Inventor), Klein, D. (Inventor) & Schoening, B. (Inventor), 30 Nov 2017, IPC No. H02J 15/ 00 A I, Patent No. DE102016109866, Priority date 30 May 2016, Priority No. DE201610109866

    Research output: Patent