Chair of Mining Engineering and Mineral Economics (200)

Organisational unit: Chair

Research output

  1. Published

    Test Stands for Bulk Material: Design of established bulk material calibration test stands in a standardised form, which can be used to simplify the determination of DEM parameters.

    Fimbinger, E., 15 May 2020, Projektbroschüre der Bergbaukunde 2019. Leoben, p. 36 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  2. Published
  3. Published

    Test mining with raise caving mining method: one-time chance to prove the concept?

    Karlsson, M., Ladinig, T. & Grynienko, M., 2022, Caving 2022: Fifth International Conference on Block and Sublevel Caving.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  4. Published

    Test method to determine breakage behaviour of blast furnace sinter

    Denzel, M., Prenner, M. & Sifferlinger, N. A., 22 Sept 2020, 24 p.

    Research output: Book/ReportCommissioned reportResearch

  5. Published

    Teleoperation von mobilen Bergbaumaschinen

    Sifferlinger, N. A., 29 Jan 2025, In: Berg- und hüttenmännische Monatshefte : BHM. 170.2025, 2, p. 88-91 4 p.

    Research output: Contribution to journalArticleResearch

  6. Published
  7. Published
  8. Published

    Tectonic stresses as the cause of asymmetry and shape deviation of subsidence profiles

    Babaryka, A., 27 Sept 2023.

    Research output: Contribution to conferencePresentationResearch

  9. Published
  10. Published