Chair of Drilling and Completion Engineering (590)
Organisational unit: Chair
351 - 360 out of 363Page size: 10
Research output
- 2006
- Published
"Evaluation of GWDC/ZPEB Drilling Contractor Performance on OMV Operations"
Ladenhauf, J., 2006Research output: Thesis › Diploma Thesis
- Published
Field Validation of Numerical Simulation Results on the Occurrence and Distribution of Combustible Gas on Onshore Drilling Units
Stuhlberger, K., 2006, 100 p.Research output: Thesis › Diploma Thesis
- Published
Hybrid Simulation using Neural Networks to Predict Drilling Hydraulics in real Time
Fruhwirth, R. K., Thonhauser, G. & Mathis, W., 2006, 2006 SPE Annual Technical Conference and exhibition. p. 0-0Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Time Based Modelling of Drill String Torque and Hook Load
Kucs, R. J. W., 2006, 60 p.Research output: Thesis › Diploma Thesis
- Published
Time Dependent Behavior of Drilling Fluids under Cyclic Temperature and Pressure Loads
Thonhauser, G., 2006, In: Proceedings of the Institution of Mechanical Engineers / B (Part B, Journal of engineering manufacture). p. 0-0Research output: Contribution to journal › Article › Research › peer-review
- Published
Use of Real-Time Rig Sensor Data to Improve Daily Drilling reporting, Benchmarking and Planning - A Case Study
Thonhauser, G., 2006, In: Proceedings of the Institution of Mechanical Engineers / B (Part B, Journal of engineering manufacture). p. 0-0Research output: Contribution to journal › Article › Research › peer-review
- 2005
- Published
Aufbereitungsanlage für Ersatzbrennstoffe (ThermoTeam-Anlage) Qualitätsrelevante Anlagenmodifikationen und Weiterentwicklung der Qualitätssicherung
Prohaska-Marchried, M., Pomberger, R. & Lorber, K., 2005, Schriftenreihe des Instituts für Abfallwirtschaft und Altlasten.Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Drilling Problem Analysis in the Mittelplate field with Solution Proposals for Future Wells
Rothschedl, M., 2005, 140 p.Research output: Thesis › Diploma Thesis
- Published
Real Time Hydraulics Modelling Under Realistic Wellbore Conditions
Wagner, S., 2005, 95 p.Research output: Thesis › Diploma Thesis
- Published