Chair of Drilling and Completion Engineering (590)
Organisational unit: Chair
191 - 200 out of 365Page size: 10
Research output
- Published
Experimental determination of wellbore diameter and shape (4D imaging of wellbore) by using ultrasonic caliper within different fluids for real-time drilling application
Elahifar, B., Esmaeili, A., Fruhwirth, R. K. & Thonhauser, G., 2013, In: Oil gas European magazine. 39, 1, p. 16-19 4 p.Research output: Contribution to journal › Conference article › peer-review
- Published
Experimental Design to Investigate the Casing Smearing Effect
Hirschl, D. M., 2017Research output: Thesis › Master's Thesis
- Published
Experimental Approach to Evaluate Non-Damaging Drill-in Fluid
Halilovic, M., 2020Research output: Thesis › Master's Thesis
- Published
Experimental approach for assessing filter-cake removability derived from reservoir drill-in fluids
Elmgerbi, A., Thonhauser, G., Fine, A., Borovina, A. & Hincapie , R., 8 Sept 2021.Research output: Contribution to conference › Paper › peer-review
- Published
Evaluation of wellbore cement integrity for groundwater protection
Thonhofer, C., 2015Research output: Thesis › Master's Thesis
- Published
Evaluation of Micro-Fractures and Pore Plugging Effects in Caprock Shale
Leon Escobar, S., 2019Research output: Thesis › Master's Thesis
- Published
"Evaluation of GWDC/ZPEB Drilling Contractor Performance on OMV Operations"
Ladenhauf, J., 2006Research output: Thesis › Diploma Thesis
- Published
Evaluation of Dynamic Loads Running Tubulars in Wells
Mühlböck, M., 2009Research output: Thesis › Master's Thesis
- Published
Evaluation of Cement-Casing & Cement-Rock Bond Integrity during Well Operations.
Lamik, A., Thonhauser, G., Ravi, K., Prohaska-Marchried, M., Pittino, G. & Antretter, T., 27 May 2021, p. 1-13. 13 p.Research output: Contribution to conference › Paper › peer-review
- Published
Evaluation and Optimization of Contractor Relevant Drilling KPIs
Holzer, D., 2015Research output: Thesis › Master's Thesis