The Tunneling Information Management System: A tool for documenting the tunneling process in NATM projects
Publikationen: Beitrag in Fachzeitschrift › Artikel › Forschung › (peer-reviewed)
Standard
in: Geomechanics and tunnelling = Geomechanik und Tunnelbau, Jahrgang 15.2022, Nr. 3, 03.06.2022, S. 259-264.
Publikationen: Beitrag in Fachzeitschrift › Artikel › Forschung › (peer-reviewed)
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - JOUR
T1 - The Tunneling Information Management System
T2 - A tool for documenting the tunneling process in NATM projects
AU - Huymajer, Marco
AU - Operta, Dzan
AU - Mazak-Huemer, Alexandra
AU - Huemer, Christian
N1 - Publisher Copyright: © 2022 Ernst & Sohn GmbH.
PY - 2022/6/3
Y1 - 2022/6/3
N2 - The documentation of the tunneling process is a crucial task of every tunnel construction project. It provides evidence of the work performed and thus, serves as a basis for invoicing and for several further analyses. Therefore, continuous digitalisation of this documentation is essential. For this purpose, we provide a digital Tunneling Information Management System (TIMS), which is a prototypically implemented software tool for replacing the still common paper-based documentation process of tunneling projects using the New Austrian Tunneling Method (NATM). The data model presented here defines the data structures managed by this tool. Based on this, the software architecture and the implementation of TIMS is shown.
AB - The documentation of the tunneling process is a crucial task of every tunnel construction project. It provides evidence of the work performed and thus, serves as a basis for invoicing and for several further analyses. Therefore, continuous digitalisation of this documentation is essential. For this purpose, we provide a digital Tunneling Information Management System (TIMS), which is a prototypically implemented software tool for replacing the still common paper-based documentation process of tunneling projects using the New Austrian Tunneling Method (NATM). The data model presented here defines the data structures managed by this tool. Based on this, the software architecture and the implementation of TIMS is shown.
KW - digital transformation
KW - documentation process
KW - software tool
KW - tunnel process management
KW - New Austrian Tunneling Method
UR - http://www.scopus.com/inward/record.url?scp=85131716405&partnerID=8YFLogxK
U2 - 10.1002/geot.202100064
DO - 10.1002/geot.202100064
M3 - Article
VL - 15.2022
SP - 259
EP - 264
JO - Geomechanics and tunnelling = Geomechanik und Tunnelbau
JF - Geomechanics and tunnelling = Geomechanik und Tunnelbau
SN - 1865-7362
IS - 3
ER -