Application of Big Data analysis systems for drilling operations optimization
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Standard
2019.
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Application of Big Data analysis systems for drilling operations optimization
AU - Dzhafarov, Renat
N1 - no embargo
PY - 2019
Y1 - 2019
N2 - In the conditions of market uncertainty, unstable oil price and development of oil and gas field with complex geological structure, the tasks of optimization and costs reduction for well construction become especially relevant for oil and gas producing and drilling service companies. The current situation is forcing companies to reduce volumes of drilling and abandon a number of planned projects. The time spent for a well construction basically depends on drilling crews’ qualification and coordinated work of all service organizations involved in the process. The means of increasing the work speed are not only transition to the use of more sophisticated equipment, but also rational and efficient organization of all processes. The thesis focuses on costs reduction for a well drilled by Gazprom EP International, which could be achieved with mud logging data processing using the ProNova data analysis system. Key features, advantages and disadvantages of the technology are discussed and potential time savings are calculated.
AB - In the conditions of market uncertainty, unstable oil price and development of oil and gas field with complex geological structure, the tasks of optimization and costs reduction for well construction become especially relevant for oil and gas producing and drilling service companies. The current situation is forcing companies to reduce volumes of drilling and abandon a number of planned projects. The time spent for a well construction basically depends on drilling crews’ qualification and coordinated work of all service organizations involved in the process. The means of increasing the work speed are not only transition to the use of more sophisticated equipment, but also rational and efficient organization of all processes. The thesis focuses on costs reduction for a well drilled by Gazprom EP International, which could be achieved with mud logging data processing using the ProNova data analysis system. Key features, advantages and disadvantages of the technology are discussed and potential time savings are calculated.
KW - automatization
KW - Key Performance Indicators
KW - crew performance efficiency
KW - time & cost savings
KW - Automatisierung
KW - Leistungsindikatoren
KW - wirksame Leistung
KW - Zeit- und Kosteneinsparung
M3 - Master's Thesis
ER -