A New Approach To A Real-Time Risk Map Development For A Decision Making Process Within Emergency Response
Publikationen: Konferenzbeitrag › Paper
Standard
2020. 129 - 131 Beitrag in International Scientific Applied Conference "Problems of Emergency Situations", Charkiw, Ukraine.
Publikationen: Konferenzbeitrag › Paper
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - CONF
T1 - A New Approach To A Real-Time Risk Map Development For A Decision Making Process Within Emergency Response
AU - Patsekha, Aliaksei
AU - Hohenberger, Michael
AU - Raupenstrauch, Harald
PY - 2020/5/20
Y1 - 2020/5/20
N2 - An effective emergency response to CBRNE accidents that represent highly dynamic situations needs immediate actions within limited time, information and resources. The aim of the study is to provide the foundation for division of unsafe area into risk zones according to the impact of hazardous parameters (heat radiation, thermal dose, overpressure, chemical concentrations). A decision on the boundary values for three risk zones is based on the vulnerability analysis that covered a variety of accident scenarios containing the release of a toxic or flammable substance which either evaporates, ignites and/or explodes. Critical values are selected for the boundary definition of the Red, Orange and Yellow risk zones upon the examination of harmful effects that are likely to cause injuries of varying severity to people and different levels of damage to structures. The obtained results provide the basis for creating a comprehensive real-time risk map for a decision support at CBRNE operations within the ERIMAPS project.
AB - An effective emergency response to CBRNE accidents that represent highly dynamic situations needs immediate actions within limited time, information and resources. The aim of the study is to provide the foundation for division of unsafe area into risk zones according to the impact of hazardous parameters (heat radiation, thermal dose, overpressure, chemical concentrations). A decision on the boundary values for three risk zones is based on the vulnerability analysis that covered a variety of accident scenarios containing the release of a toxic or flammable substance which either evaporates, ignites and/or explodes. Critical values are selected for the boundary definition of the Red, Orange and Yellow risk zones upon the examination of harmful effects that are likely to cause injuries of varying severity to people and different levels of damage to structures. The obtained results provide the basis for creating a comprehensive real-time risk map for a decision support at CBRNE operations within the ERIMAPS project.
KW - CBRNE Notfälle
KW - Einsatzorganisationen
KW - Echtzeit-Risikokarte
KW - Einsatzassistent
M3 - Paper
SP - 129
EP - 131
T2 - International Scientific Applied Conference "Problems of Emergency Situations"
Y2 - 20 May 2020 through 20 May 2020
ER -