Research output

  1. 2015
  2. Published

    Dimensioning of tunnel linings based on the results of flat jack tests

    Galler, R. & Lorenz, S., 1 Oct 2015.

    Research output: Contribution to conferencePresentationResearch

  3. Published

    Development of resource-efficient tunnelling technologies - Results of the European research project DRAGON

    Galler, R., 3 Aug 2015, In: Geomechanics and tunnelling. 8.2015, 4, p. 302-309 8 p.

    Research output: Contribution to journalArticleResearchpeer-review

  4. Published

    System zum Ermitteln eines Ortsbrustbilds

    Galler, R., Wenighofer, R. & Entacher, M., 15 Jul 2015, IPC No. E21B 44/ 00 A I, Patent No. AT14252U, Priority date 30 Jul 2013, Priority No. AT20130050107U

    Research output: Patent

  5. Published

    NUMERICAL ANALYSIS OF THE ROCK CUTTING PROCESS BASED ON A TWO PARAMETER DESCRIPTION OF TENSILE STRENGTH USING THE WEIBULL THEORY

    Mikl-Resch, M. J., Tichy, R., Antretter, T., Pittino, G., Galler, R., Ecker, W., Gimpel, M. & Kargl, H., 13 May 2015. 5 p.

    Research output: Contribution to conferencePresentationResearchpeer-review

  6. Published

    NUMERICAL ANALYSIS OF THE ROCK CUTTING PROCESS BASED ON A TWO PARAMETER DESCRIPTION OF TENSILE STRENGTH USING THE WEIBULL THEORY

    Mikl-Resch, M. J., Antretter, T., Tichy, R., Pittino, G., Galler, R., Ecker, W., Gimpel, M. & Kargl, H., 10 May 2015. 5 p.

    Research output: Contribution to conferencePosterResearch

  7. Published

    NUMERICAL ANALYSIS OF THE ROCK CUTTING PROCESS BASED ON A TWO PARAMETER DESCRIPTION OF TENSILE STRENGTH USING THE WEIBULL THEORY

    Mikl-Resch, M. J., Antretter, T., Tichy, R., Pittino, G., Galler, R., Ecker, W., Gimpel, M. & Kargl, H., 10 May 2015, ISRM 2015_PROCEEDINGS. 5 p. 724

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  8. Published

    Development of Resource-Efficient Tunnelling Technologies: Results of the European Research Project DRAGON

    Galler, R., 20 Mar 2015, Cross Alpine Corridors: Brenner Congress 2015. p. 55-59 5 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  9. Published

    SYSTEM ZUM ERMITTELN EINES ORTSBRUSTBILDES

    Galler, R., Wenighofer, R. & Entacher, M., 5 Feb 2015, Patent No. WO2015014655, Priority date 30 Jul 2013, Priority No. AT20130050107U

    Research output: Patent

  10. Published

    Disc cutter load monitoring system - DCLM

    Barwart, S., Galler, R. & Himmelsbach, C., 2015, See Tunnel. Promoting Tunnelling in South East European Region: Proceedings of the ITA-AITES World Tunnel Congress 2015. p. 594 595 p. 8.13

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  11. Published

    Forschungs- und Entwicklungsschwerpunkte am Lehrstuhl für Subsurface Engineering

    Galler, R., 2015, In: Berg- und hüttenmännische Monatshefte : BHM. 160, 10-11, p. 475-481 7 p.

    Research output: Contribution to journalArticleResearchpeer-review