Optimierung des Versorgungskonzeptes für den Innenausbau eines langen Eisenbahntunnels

Research output: ThesisMaster's Thesis

Abstract

The railbound concrete supply for the inner lining of long railway tunnels poses a considerable logistical challenge. Due to long transport distances and possible complex time schedules, a thourogh planning as well as ongoing optimisations of the logistics concept are essential. Based on the construction site Koralmtunnel KAT 2, this thesis investigates the development of a dynamic methodology which uses a module-based programming to calculate necessary supply trips from a given construction schedule. The results are the basis for an overall analysis of the described problem.

Details

Translated title of the contributionOptimisation of the supply concept for the inner lining of a long railway tunnel
Original languageGerman
QualificationDipl.-Ing.
Supervisors/Advisors
  • Galler, Robert, Supervisor (internal)
  • Uschan, Robert, Supervisor (external), External person
Award date30 Jun 2017
Publication statusPublished - 2017