Downhole Data Transmission in Extended Reach Drilling Utilizing Wired Drill Pipe Technology

Research output: ThesisMaster's Thesis

Bibtex - Download

@mastersthesis{4e85405a4a5846c282e76b97b0a3d5b2,
title = "Downhole Data Transmission in Extended Reach Drilling Utilizing Wired Drill Pipe Technology",
abstract = "Currently used mud pulse telemetry technology has some drawbacks which limit the economic viability and feasibility of extended reach wells construction. Wired drill pipe technology as a means to transmit downhole data is being considered. The thesis focuses on economic feasibility assessment of wired drill pipes application for extended reach drilling through time and cost analysis. The main project partner is OMV. The project has three advisors: Antony Martin (OMV), Prof. Gerhard Thonhauser (Montanuniversit{\"a}t Leoben), Prof. Aleksandr Oganov (Gubkin University). History of wired drill pipe technologies is provided in chapter 2. The next chapter describes WDP enabled benefits in macro-areas of drilling, formation evaluation, production, and power supply. After that, two commercial wired drill pipe systems – IntelliServ and Powerline Drillstring – are highlighted. Two extended reach wells are considered in the case study. Time savings resulted from implementation of wired drill pipe telemetry are calculated first. Then cost analysis of wired drill pipes utilization is conducted taking into account wired drill pipe related operational and capital expenditures and cost savings resulted from time savings. Finally, the author concludes whether wired drill pipe technology can make extended reach drilling more economically viable.",
keywords = "WDP, wired drill pipe, ERD, extended reach drilling, feasibility study, PDS, Powerline Drillstring, extended reach well, IntelliServ, data transmission, power supply, Daten{\"u}bertragung, Bohrung mit gro{\ss}er Reichweite, Energieversorgung, Fallstudie",
author = "Aleksandr Verkhozin",
note = "embargoed until 21-05-2024",
year = "2019",
doi = "10.34901/mul.pub.2024.121",
language = "English",
school = "Montanuniversitaet Leoben (000)",

}

RIS (suitable for import to EndNote) - Download

TY - THES

T1 - Downhole Data Transmission in Extended Reach Drilling Utilizing Wired Drill Pipe Technology

AU - Verkhozin, Aleksandr

N1 - embargoed until 21-05-2024

PY - 2019

Y1 - 2019

N2 - Currently used mud pulse telemetry technology has some drawbacks which limit the economic viability and feasibility of extended reach wells construction. Wired drill pipe technology as a means to transmit downhole data is being considered. The thesis focuses on economic feasibility assessment of wired drill pipes application for extended reach drilling through time and cost analysis. The main project partner is OMV. The project has three advisors: Antony Martin (OMV), Prof. Gerhard Thonhauser (Montanuniversität Leoben), Prof. Aleksandr Oganov (Gubkin University). History of wired drill pipe technologies is provided in chapter 2. The next chapter describes WDP enabled benefits in macro-areas of drilling, formation evaluation, production, and power supply. After that, two commercial wired drill pipe systems – IntelliServ and Powerline Drillstring – are highlighted. Two extended reach wells are considered in the case study. Time savings resulted from implementation of wired drill pipe telemetry are calculated first. Then cost analysis of wired drill pipes utilization is conducted taking into account wired drill pipe related operational and capital expenditures and cost savings resulted from time savings. Finally, the author concludes whether wired drill pipe technology can make extended reach drilling more economically viable.

AB - Currently used mud pulse telemetry technology has some drawbacks which limit the economic viability and feasibility of extended reach wells construction. Wired drill pipe technology as a means to transmit downhole data is being considered. The thesis focuses on economic feasibility assessment of wired drill pipes application for extended reach drilling through time and cost analysis. The main project partner is OMV. The project has three advisors: Antony Martin (OMV), Prof. Gerhard Thonhauser (Montanuniversität Leoben), Prof. Aleksandr Oganov (Gubkin University). History of wired drill pipe technologies is provided in chapter 2. The next chapter describes WDP enabled benefits in macro-areas of drilling, formation evaluation, production, and power supply. After that, two commercial wired drill pipe systems – IntelliServ and Powerline Drillstring – are highlighted. Two extended reach wells are considered in the case study. Time savings resulted from implementation of wired drill pipe telemetry are calculated first. Then cost analysis of wired drill pipes utilization is conducted taking into account wired drill pipe related operational and capital expenditures and cost savings resulted from time savings. Finally, the author concludes whether wired drill pipe technology can make extended reach drilling more economically viable.

KW - WDP

KW - wired drill pipe

KW - ERD

KW - extended reach drilling

KW - feasibility study

KW - PDS

KW - Powerline Drillstring

KW - extended reach well

KW - IntelliServ

KW - data transmission

KW - power supply

KW - Datenübertragung

KW - Bohrung mit großer Reichweite

KW - Energieversorgung

KW - Fallstudie

U2 - 10.34901/mul.pub.2024.121

DO - 10.34901/mul.pub.2024.121

M3 - Master's Thesis

ER -