Robert Galler

Research output

  1. 2012
  2. Published

    ÖBV-Forschungsprojekt - Recycling von Tunnelausbruch

    Galler, R., Krispel, S. & Resch, D., 2012, Betontag 2012 - Kongress und Ausstellung. p. 11-14

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  3. Published

    ÖIAV-Abend zum Jahrhundertprojekt Koralmtunnel

    Galler, R., 2012, In: Baumaschine, Baugerät, Baustelle : BBB. 48, 4, p. 72-72

    Research output: Contribution to journalArticleResearchpeer-review

  4. Published

    Prognose von Tunnelausbruchsmaterial

    Galler, R., Biermeier, F. & Lassnig, K., 2012.

    Research output: Contribution to conferencePosterResearchpeer-review

  5. Published

    Randbedingungen der Verwertung von Tunnelausbruchmaterial

    Galler, R., Resch, D. & Entacher, M., 2012.

    Research output: Contribution to conferencePosterResearchpeer-review

  6. Published

    Schneidversuche an Imbergsandstein

    Entacher, M., Henzinger, M., Galler, R. & Frenzel, C., 2012.

    Research output: Contribution to conferencePosterResearchpeer-review

  7. Published

    Spritzbeton für druckhaftes Gebirge - Ein einfacher, flexibler und daher wirtschaftlicher Ansatz für das Problem der Durchörterung von druckhaftem Gebirge

    Röck, R., Baumgärtner, J., Galler, R., Volderauer, C. & Pittino, G., 2012, Spritzbeton-Tagung 2012. p. 1-12

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  8. Published

    Stabilitätsanalyse eines aufgelassenen Gipsbergbaus, von der Datenerfassung zur numerischen 3D-Simulation

    Gschwandtner, G. & Galler, R., 2012, In: Glückauf. p. 775-783

    Research output: Contribution to journalArticleResearchpeer-review

  9. Published

    Stabilitätsanalyse eines aufgelassenen Gipsbergbaus - Von der geologischen-hydrogeologischen-geotechnischen Datenerfassung zur numerischen 3D-Simulation

    Gschwandtner, G. & Galler, R., 2012, 12. Altbergbaukolloquium. p. 117-128

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  10. Published

    Stabilitätsanalyse komplexer Hohlraumbauten, von der Datenerfassung bis zur numerischen 3D Simulation

    Gschwandtner, G. & Galler, R., 2012, In: Advanced mining solutions. 02, p. 13-24

    Research output: Contribution to journalArticleResearchpeer-review

  11. Published

    Stabilitätsbetrachtung von Untertagebauwerken unter Berücksichtigung von Lösungsprozessen in wassersensitiven Gebirgsformationen

    Gschwandtner, G. & Galler, R., 2012, 14. Geoforum Umhausen 2012 - Tagungsband. p. 1-12

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  12. Published

    Stability analysis of complex underground structures - from data acquisition to 3D numerical simulation

    Gschwandtner, G. & Galler, R., 2012, AIMS 2012 - 7th International Symposium Rockbolting and Rock Mechanics in Mining. p. 75-87

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  13. Published

    Subsurface Engineering - SE

    Galler, R., 2012.

    Research output: Contribution to conferencePosterResearchpeer-review

  14. Published

    Thoughts on support dimensioning with aid of calculation models

    Galler, R., 2012, 50 Years of NATM - Experience Reports. p. 39-47

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  15. Published

    Thoughts on the further development of the NATM

    Galler, R. & Stipek, W., 2012, 50 Years of NATM - Experience Reports. p. 221-224

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  16. Published

    Tunneltag 2012 und Österreichisches Geomechanik Kolloquium

    Galler, R., 2012, In: Berg- und hüttenmännische Monatshefte : BHM. p. 468-469

    Research output: Contribution to journalArticleResearchpeer-review

  17. Published

    Verwendung von Tunnelausbruchmaterial - Entscheidungsgrundlagen

    Resch, D. & Galler, R., 2012, Depo Tech 2012 - Tagungsband zur 11. DepoTech-Konferenz. p. 89-94

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  18. Published

    ZaB - Zentrum am Berg (Poster 1)

    Galler, R., 2012.

    Research output: Contribution to conferencePosterResearchpeer-review

  19. Published

    ZaB - Zentrum am Berg (Poster 2)

    Galler, R., 2012.

    Research output: Contribution to conferencePosterResearchpeer-review

  20. 2011
  21. Published
  22. Published

    Application and testing of plastic fibre reinforced dry-mix shotcrete

    Pittino, G., Mößlacher, A., Schwab, P. & Galler, R., 2011, In: Geomechanics and tunnelling. 4, p. 63-69

    Research output: Contribution to journalArticleResearchpeer-review

  23. Published

    Der schwierige Weg durch den Bosruck - heimisches Know-how weltweit gefragt: news.ORF.at

    Galler, R., 2011

    Research output: Non-textual formWeb publication/siteTransfer

  24. Published

    Einige Gedanken zur gebirgsmechanischen Beurteilung von Untertagebauwerken.

    Gschwandtner, G. & Galler, R., 2011, In: Berg- und hüttenmännische Monatshefte : BHM. p. 482-486

    Research output: Contribution to journalArticleResearchpeer-review

  25. Published

    Entwicklung einer Großversuchsanlage zur Bestimmung der Komprimierbarkeit von Spritzbeton

    Volderauer, C., Röck, R., Galler, R. & Pittino, G., 2011, In: Berg- und hüttenmännische Monatshefte : BHM. 156, p. 384-389

    Research output: Contribution to journalArticleResearchpeer-review

  26. Published

    Fair contracts in the field of tunnelling

    Galler, R., 2011, Using Underground Space. - Proceedings of the 1st Scientific Congress on Tunnels and Underground Structures in South-East Europe. p. 206-207

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  27. Published

    Geothermie-Tiefenkraftwerk - prinzipielle Machbarkeit?

    Galler, R., Muser, C., Hämmerle, H. & Schubert, W., 2011, In: Berg- und hüttenmännische Monatshefte : BHM. p. 498-503

    Research output: Contribution to journalArticleResearchpeer-review

  28. Published

    Ground Deformation Behaviours and Monitoring Interpretation

    Galler, R., 2011, NATM Training Course - First Asian and 9th Iranian Tunneling Symposium - Part II. p. 1-50

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  29. Published

    Informe general sobre el método convencional de túneles

    Ehrbar, H., Galler, R. & Assis, A., 2011

    Research output: Book/ReportCommissioned reportTransferpeer-review

  30. Published

    Interaction between Lining and Ground

    Galler, R., 2011, NATM Training Course - First Asian and 9th Iranian Tunneling Symposium - Part II. p. 1-42

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  31. Published

    New developments for the implementation of a time-dependent material behaviour into the Convergence Confinement Method.

    Gschwandtner, G. & Galler, R., 2011, World Tunnel Congress 2011 - Proceedings. p. 78-79

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  32. Published

    Numerische Modellierung des Verformungszustandes hochbelasteter Abbauwerkzeuge von Tunnelbohrmaschinen

    Bumberger, T., Entacher, M., Winter, G., Godor, I. & Galler, R., 2011, Tagungsband "Berechnungsverfahren in der Geotechnik - Versagensmechanismen und Parameterentwicklung". p. 88-94

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  33. Published
  34. Published

    Rahmenbedingungen für die Wiederverwertung von Tunnelausbruchmaterial

    Resch, D., Entacher, M., Lassnig, K., Ritter, S., Galler, R. & Alfreider, D., 2011.

    Research output: Contribution to conferencePosterResearchpeer-review

  35. Published

    Recycling of tunnel spoil - laws affecting waste from mining and tunnelling

    Entacher, M., Resch, D., Reichel, P. & Galler, R., 2011, In: Geomechanics and tunnelling. 4, p. 692-701

    Research output: Contribution to journalArticleResearchpeer-review

  36. Published

    Roofex bolt and its application in tunnelling by dealing with high stress ground conditions.

    Galler, R., Gschwandtner, G. & Doucet, C., 2011, World Tunnel Congress 2011 - Proceedings. p. 200-200

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  37. Published

    Sequential Excavation in Soft Ground and Hard Rock

    Galler, R., 2011, NATM Training Course - First Asian and 9th Iranian Tunneling Symposium - Part II. p. 1-47

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  38. Published
  39. Published

    Three Dimensional Load Analysis of Tunnel Linings using NATM

    Galler, R., Usman, M. & Gschwandtner, G., 2011, International Conference on Advances in Geotechnical Engineering 2011. p. 959-964

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  40. Published

    Vorwort

    Galler, R. & Unterberger, W., 2011, Spezialseminar: UVP - Chance oder Fessel für Projekte?. p. 1-2

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  41. Published

    Wertvoller Rohstoff Tunnelausbruch

    Galler, R., 2011, In: Impuls Z : die Zeitung der steirischen Impulszentren . 2, p. 10-10

    Research output: Contribution to journalArticleResearchpeer-review

  42. Published

    Wiederverwertung von Tunnelausbruchmaterial - Abfallrecht im Berg- und Tunnelbau

    Entacher, M., Resch, D., Reichel, P. & Galler, R., 2011, In: Berg- und hüttenmännische Monatshefte : BHM. 156, p. 379-383

    Research output: Contribution to journalArticleResearchpeer-review

  43. 2010
  44. Published

    Austrian Southern Railway Link Conference 2009 - Südbahntagung 2009

    Galler, R., 2010, In: Geomechanics and tunnelling. 3.2010, 2, p. 90 1 p.

    Research output: Contribution to journalEditorialpeer-review

  45. Published

    Beitrag zur Anwendung des Kennlinienverfahrens

    Galler, R., Kainrath-Reumayer, S., Gschwandtner, G. & Schuller, E., 2010, In: Berg- und hüttenmännische Monatshefte : BHM. p. 83-89

    Research output: Contribution to journalArticleResearchpeer-review

  46. Published

    Concept of Austrian Construction Contract

    Galler, R., 2010, Tunnelling in difficult ground conditions/An International NATM Workshop. p. 1-30

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  47. Published

    Criteria for the Layout of Underground Structures

    Galler, R., 2010, Tunnelling in difficult ground conditions/An International NATM Workshop. p. 1-54

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  48. Published

    Deep geothermal energy - an interdisciplinary challenge

    Galler, R., Schubert, W., Muser, C. & Hämmerle, H., 2010, In: Geomechanics and tunnelling. p. 669-678

    Research output: Contribution to journalArticleResearchpeer-review

  49. Published

    Design and Construction of Railway Tunnels in soil and hard rock in Western Austria

    Galler, R., 2010, Tunnelling in difficult ground conditions/An International NATM Workshop. p. 1-30

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  50. Published

    Editorial - 59. Geomechanics Colloquium

    Galler, R., 2010, In: Geomechanics and tunnelling. p. 420-421

    Research output: Contribution to journalEditorialpeer-review

  51. Published

    Einsatz und Prüfung von Faserspritzbeton am Beispiel "Conrad Observatorium - Baustufe 2"

    Pittino, G., Mößlacher, A., Schwab, P. & Galler, R., 2010, In: Berg- und hüttenmännische Monatshefte : BHM. 155. Jg., p. 585-591

    Research output: Contribution to journalArticleResearchpeer-review

  52. Published

    Erzberg: Zentrum am Berg als wichtiges Praxislabor

    Galler, R., 2010, In: Kleine Zeitung / Steiermark - Leoben und rund um den Erzberg. p. 25-25

    Research output: Contribution to journalArticleResearchpeer-review

  53. Published

    Forschungsprojekt Verwertung von Tunnelausbruchsmaterial - aktueller Projektstand aus technisch-rechtlicher Sicht

    Resch, D. & Galler, R., 2010, Journal of Alpine Geology - PANGEO 2010. Geoaustria, p. 211-212

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

Previous 1...3 4 5 6 7 8 9 Next