Department Mineral Resources Engineering

Organisational unit: Departments and Institutes

Research output

  1. Published

    A Combined Hydro-Mechanical and Pyrometallurgical Recycling Approach to Recover Valuable Metals from Lithium-Ion Batteries Avoiding Lithium Slagging

    Holzer, A., Zimmermann, J., Wiszniewski, L., Necke, T., Gatschlhofer, C., Öfner, W. & Raupenstrauch, H., 26 Dec 2022, In: Batteries. 9.2023, 1, 26 p.

    Research output: Contribution to journalArticleResearchpeer-review

  2. E-pub ahead of print

    A comparative case-study on social and public administration aspects on mineral deposits safeguarding in chosen European countries

    Gałaś, A., Kot-Niewiadomska, A., Simic, V., Tost, M., Warell, L. & Gałaś, S., 5 Jul 2023, (E-pub ahead of print) In: Resources Policy. 85.2023, August Part B, 11 p., 103863.

    Research output: Contribution to journalArticleResearchpeer-review

  3. Published
  4. Published

    A comprehensive skills catalogue for the raw materials sector and the structure of raw materials education worldwide

    Hartlieb, P., Jorda Bordehore, L., Regueiro y González-Barros, M., Correia, V. & Vidovic, J., 28 May 2020, In: Mining Technology: Transactions of the Institute of Mining and Metallurgy. 129.2020, 2, p. 82-94 13 p.

    Research output: Contribution to journalArticleResearchpeer-review

  5. Published

    A concept for the determination of the impact of the surrounding rock mass in drift development with road headers

    Heiss, C., Moser, P. & Egger, F., 2008, Innovations in Non_Blasting Rock Destructuring. p. 159-168

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  6. Published
  7. Published

    Activity report ITA Austria 2006

    Galler, R., 2007, In: Tribune : ITA newsletter - la lettre de l'AITES. p. 23-24

    Research output: Contribution to journalArticleResearchpeer-review

  8. Published

    Adaptive and parameterised 3D BIM model for the tunnel tender and excavation phase

    Wenighofer, R., Eder, N., Speckmoser, V., Villeneuve, M., Winkler, L. & Galler, R., 3 Jun 2022, In: Geomechanics and tunnelling = Geomechanik und Tunnelbau. 15.2022, 3, p. 272-278 7 p.

    Research output: Contribution to journalArticleResearchpeer-review

  9. Published

    A database of underground hardrock mines

    Moser, P. & Oberndorfer, T., 1996, In: CIM bulletin : Canadian mining and metallurgical bulletin. Volume 89, p. 49-52

    Research output: Contribution to journalArticleResearchpeer-review

  10. Published

    Addressing Energy Efficiency in Quarries – First Stage in the Development of a Holistic Approach

    Sanchez, F. & Hartlieb, P., 14 Sept 2022, p. 21-23. 3 p.

    Research output: Contribution to conferenceAbstractpeer-review

Previous 1...3 4 5 6 7 8 9 10 ...352 Next