Department Mineral Resources Engineering
Organisational unit: Departments and Institutes
Research output
- 1996
- Published
Blasting control for underground mining with special reference to in-situ measurements and tests
Moser, P., 1996, Tagungsband der Konferenz Joint Workshop on mining, mineral processing and recycling. European Commission and Canada Centre for Mineral and Energy Technology. p. 28-35Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Drill and blast data analysis procedure for the purpose of blast performance improvement in underground drifting
Moser, P., 1996, Tagungsband der Konferenz "5th International Symposium on Rock Fragmentation by Blasting". p. 361-369Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Ist der untertägige Abbau von Massenrohstoffen eine Alternative zur obertägigen Gewinnung?
Moser, P. & Wagner, H., 1996, Bergbautechnik und Sicherheit, Heft 8. p. 7-17Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Monitoring of the performance in drift blasting
Moser, P. & Siefert, M., 1996, Tagungsband der Fith International Symposium on Mine Planning and Equipment Selection. p. 443-440Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Primary development of underground hardrock mines
Moser, P., 1996, Tagungsband der Fifth International Symposium on Mine Planning and Equipment Selection. p. 31-36Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- Published
Rock and rock mass properties prediction based on drilling parameters for underground drift blasting
Moser, P. & Wagner, H., 1996, Tagungsband der Konferenz "5th International Symposium on Rock Fragmentation by Blasting". p. 415-423Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- 1997
- Published
Blasting control for underground mining with special reference to in-situ measurements and tests
Moser, P. & Wagner, H., 1997, In: Fragblast. p. 243-259Research output: Contribution to journal › Article › Research › peer-review
- Published
Primary development of underground hardrock deposits
Moser, P., 1997Research output: Thesis › Habilitation thesis › peer-review
- Published
Shaft versus ramp - an empirical decision model
Moser, P., 1997, SME preprint. p. 97-7Research output: Chapter in Book/Report/Conference proceeding › Conference contribution
- 1998
- Published
Fehlstellen in Schlitzwänden - Einfluss auf das Rückhaltevermögen für Schadstoffe
Pittino, G. & Anreiter, W., 1998, DepoTech 1998 - Restabfallbehandlung, Deponietechnik, Entsorgungsbergbau und Altlastenproblematik. p. 119-126Research output: Chapter in Book/Report/Conference proceeding › Conference contribution