Chair of Mining Engineering and Mineral Economics (200)

Organisational unit: Chair

Research output

  1. Published

    Belt Turnover Simulation: Applying the developed belt simulation methodology to analyse the behaviour of conveyor belts in belt turnover stations.

    Fimbinger, E., 15 May 2020, Projektbroschüre der Bergbaukunde 2019. Leoben, p. 34 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  2. Published

    Study on Flexible Crops as Bulk Material: Characterisation, modelling and calibration of agricultural crops with flexible structures for the use in Discrete Element Method (DEM) simulations.

    Fimbinger, E. & Zagler, S., 15 May 2020, Projektbroschüre der Bergbaukunde 2019. Leoben, p. 35 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  3. Published

    DEM-Simulation of Pasty Material: Modelling pasty material behaviour with contact model analysation/customisation and parameter adjustment in Discrete Element Method (DEM) Simulations.

    Fimbinger, E. & Platzer, F., 15 May 2020, Projektbroschüre der Bergbaukunde 2019. Leoben, p. 33 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  4. Published

    Test Stands for Bulk Material: Design of established bulk material calibration test stands in a standardised form, which can be used to simplify the determination of DEM parameters.

    Fimbinger, E., 15 May 2020, Projektbroschüre der Bergbaukunde 2019. Leoben, p. 36 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  5. Published

    Conveyor Belt Breakage Simulation: DEM-based bonded particle modelling technique to depict belt breakage in operating belt conveyors while transporting bulk materials.

    Fimbinger, E., 12 May 2021, Projektbroschüre der Bergbaukunde 2020. Leoben, p. 31 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  6. Published

    Complex Bonded Structures as Fracturable Particles: Modelling of three-dimensional DEM bonded-particle structures with specific bonding criteria allowing complex breakage into several fragments.

    Fimbinger, E. & Platzer, F., 12 May 2021, Projektbroschüre der Bergbaukunde 2020. Leoben, p. 30-30 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  7. Published

    Multi-Physics DEM Simulation: Capabilities & features of the simulation software ThreeParticle/CAE as a powerful platform for virtual prototyping with complex bulk materials.

    Fimbinger, E. & Becker, A., 12 May 2021, Projektbroschüre der Bergbaukunde 2020. Leoben, p. 32 1 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterResearch

  8. Published

    A device, charging unit and method of filling a borehole with an explosive material

    Finn, O. (Inventor), Moser, P. (Inventor), Finn, O. (Inventor), Moser, P. (Inventor) & Hohl, W. (Inventor), 11 Dec 2008, IPC No. F42D 3/ 04 A I, Patent No. AU2008258857, Priority date 4 Jun 2008, Priority No. WO2008EP04452

    Research output: Patent

  9. Published

    Abbauplanung der Schwebenrückgewinnung im Gipsbergbau Preinsfeld

    Fischer, A., Hartlieb, P. & Daul, J., 16 Apr 2020, In: Berg- und hüttenmännische Monatshefte : BHM. 165.2020, 6, p. 270-273 4 p.

    Research output: Contribution to journalArticleResearch

  10. Published