Optimisation of the drill and blast work in the open pit Rabenwald mine of Rio Tinto Minerals

Publikationen: Thesis / Studienabschlussarbeiten und HabilitationsschriftenDiplomarbeit

Standard

Optimisation of the drill and blast work in the open pit Rabenwald mine of Rio Tinto Minerals. / Bauer, Florian.
2007.

Publikationen: Thesis / Studienabschlussarbeiten und HabilitationsschriftenDiplomarbeit

Bibtex - Download

@phdthesis{7402af230680416dab154f621dce5bb2,
title = "Optimisation of the drill and blast work in the open pit Rabenwald mine of Rio Tinto Minerals",
abstract = "Aim of this thesis was an investigation into the drilling and blasting work in the open pit talc mine of Rio Tinto Minerals. In a first step the actual state of drilling and blasting was determined. For that purpose all aspects of drilling and blasting were examined, from the planning process at the beginning, a wall surveying program, the drilling process, the charging of the holes up to the documentation and measurement of ground vibrations and blast results. In a second step the current state was compared to the latest technology in drilling and blasting and a gap-analysis conducted. It was found that in some areas already a better utilisation of available equipment would contribute very much to a process towards the latest technology. Nevertheless in other areas a bigger investment, like a new automatic drilling and GPS-guided surface crawler is necessary to bring the open pit mine to a higher level of technology. What is common for all areas of work is that a thorough planning process is needed as a basis. This is also recommended as a target for the future, to build up a management system for the whole drilling and blasting process as a central guidance and planning tool to make the process more economic and safer.",
keywords = "drilling blasting state of the art optimisation, Bohren Sprengen Neuester Stand der Technik Optimierung",
author = "Florian Bauer",
note = "embargoed until null",
year = "2007",
language = "English",
type = "Diploma Thesis",

}

RIS (suitable for import to EndNote) - Download

TY - THES

T1 - Optimisation of the drill and blast work in the open pit Rabenwald mine of Rio Tinto Minerals

AU - Bauer, Florian

N1 - embargoed until null

PY - 2007

Y1 - 2007

N2 - Aim of this thesis was an investigation into the drilling and blasting work in the open pit talc mine of Rio Tinto Minerals. In a first step the actual state of drilling and blasting was determined. For that purpose all aspects of drilling and blasting were examined, from the planning process at the beginning, a wall surveying program, the drilling process, the charging of the holes up to the documentation and measurement of ground vibrations and blast results. In a second step the current state was compared to the latest technology in drilling and blasting and a gap-analysis conducted. It was found that in some areas already a better utilisation of available equipment would contribute very much to a process towards the latest technology. Nevertheless in other areas a bigger investment, like a new automatic drilling and GPS-guided surface crawler is necessary to bring the open pit mine to a higher level of technology. What is common for all areas of work is that a thorough planning process is needed as a basis. This is also recommended as a target for the future, to build up a management system for the whole drilling and blasting process as a central guidance and planning tool to make the process more economic and safer.

AB - Aim of this thesis was an investigation into the drilling and blasting work in the open pit talc mine of Rio Tinto Minerals. In a first step the actual state of drilling and blasting was determined. For that purpose all aspects of drilling and blasting were examined, from the planning process at the beginning, a wall surveying program, the drilling process, the charging of the holes up to the documentation and measurement of ground vibrations and blast results. In a second step the current state was compared to the latest technology in drilling and blasting and a gap-analysis conducted. It was found that in some areas already a better utilisation of available equipment would contribute very much to a process towards the latest technology. Nevertheless in other areas a bigger investment, like a new automatic drilling and GPS-guided surface crawler is necessary to bring the open pit mine to a higher level of technology. What is common for all areas of work is that a thorough planning process is needed as a basis. This is also recommended as a target for the future, to build up a management system for the whole drilling and blasting process as a central guidance and planning tool to make the process more economic and safer.