Drilling Problem Analysis in the Mittelplate field with Solution Proposals for Future Wells
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Diplomarbeit
Standard
2005. 140 S.
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Diplomarbeit
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Drilling Problem Analysis in the Mittelplate field with Solution Proposals for Future Wells
AU - Rothschedl, Markus
N1 - no embargo
PY - 2005
Y1 - 2005
N2 - In the past wells have been drilled into the Mittelplate reservoir from the artificial drilling island Mittelplate A as well as from shore. Within the scope of the future development, the length of the directional wells, drilled to the oil bearing Dogger Sands in 2000 to 3000m depth, will increase. Especially the reservoir parts in the west and south, which are located quite a distance away from Mittelplate A, are planned to be drilled with so called “Extended Reach” wells. The drilling problems in the Mittelplate field, especially from the lower cretaceous formation on, have increased in the past due to the increasing horizontal step out from the starting point and the increased inclination of the wells. With this master thesis those drilling problems have been identified and vulgarized by using a special drilling analysis program and by analysing the real time rig data. This analysis demonstrated that there has been a hole cleaning problem, which seems to be the cause for a subsequent wellbore stability problem. Thus proposed solutions for future wells have been worked out to present possibilities to avoid problems related to hole cleaning. As a solution the application of cutting bed impeller, pressure while drilling tools, cutting flux measurement, rotary steerable systems etc. are strongly recommended. Alternative solutions, such as solid expandable tubulars and casing drilling, have been identified to reduce the problems as well.
AB - In the past wells have been drilled into the Mittelplate reservoir from the artificial drilling island Mittelplate A as well as from shore. Within the scope of the future development, the length of the directional wells, drilled to the oil bearing Dogger Sands in 2000 to 3000m depth, will increase. Especially the reservoir parts in the west and south, which are located quite a distance away from Mittelplate A, are planned to be drilled with so called “Extended Reach” wells. The drilling problems in the Mittelplate field, especially from the lower cretaceous formation on, have increased in the past due to the increasing horizontal step out from the starting point and the increased inclination of the wells. With this master thesis those drilling problems have been identified and vulgarized by using a special drilling analysis program and by analysing the real time rig data. This analysis demonstrated that there has been a hole cleaning problem, which seems to be the cause for a subsequent wellbore stability problem. Thus proposed solutions for future wells have been worked out to present possibilities to avoid problems related to hole cleaning. As a solution the application of cutting bed impeller, pressure while drilling tools, cutting flux measurement, rotary steerable systems etc. are strongly recommended. Alternative solutions, such as solid expandable tubulars and casing drilling, have been identified to reduce the problems as well.
KW - Mittelplate Germany Wadden Sea Drilling Problems Genesis Drilling Analysis Cockpit Wellbore Stability Hole cleaning Rotary Steerable Systems Pressure While Drilling Tools Cutting Bed Impeller Cutting Flux Measurement Solid Expandable Tubulars
KW - Mittelplate RWE Dea Deutschland Wattenmeer Probleme
KW - bohrtechnische Genesis Drilling Analysis Cockpit Wellbore Stability Hole cleaning Rotary Steerable Systems Pressure While Drilling Tools Cutting Bed Impeller Cutting Flux Measurement Solid Expandable Tubulars Casing Drilling
M3 - Diploma Thesis
ER -