Analysis on the use of a new explosive and geological condition with a mine-to-mill approach for a limestone quarry located in the vicinity of Madrid, Spain
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Standard
2024.
Publikationen: Thesis / Studienabschlussarbeiten und Habilitationsschriften › Masterarbeit
Harvard
APA
Vancouver
Author
Bibtex - Download
}
RIS (suitable for import to EndNote) - Download
TY - THES
T1 - Analysis on the use of a new explosive and geological condition with a mine-to-mill approach for a limestone quarry located in the vicinity of Madrid, Spain
AU - Gurrea Matus, Gabriel Ismael
N1 - no embargo
PY - 2024
Y1 - 2024
N2 - The main objective of this work is the analysis of the use of a new explosive and geological condition with a mine-to-mill approach for limestone in Valdilecha, Spain. Initially, a general description of the mine site is provided, where the focus is on the unitary process: Drill & Blast, Load & Hauling, and Processing stage. A group of 15 blasts is analyzed, and of these several KPIs are defined to create a Base Line for the quarry. Then this information is contrasted with data gathered collected by the team and is processed using different tools, through this is possible to contrast the data and evaluate the use of different technologies. Then, the impact of a new explosive is evaluated on 3 blasts. Through this, a New Design scenario allows a comparison between downstream process KPIs. Finally, the drill-to-mill approach seeks to digitally integrate the processes of drilling, blasting, loading, transport, and processing in the plant. It is expected that the information collected will allow the modeling of different scenarios and study their impact on the main production indicators, becoming a decision support tool for the management and administration of the daily operation of the quarry.
AB - The main objective of this work is the analysis of the use of a new explosive and geological condition with a mine-to-mill approach for limestone in Valdilecha, Spain. Initially, a general description of the mine site is provided, where the focus is on the unitary process: Drill & Blast, Load & Hauling, and Processing stage. A group of 15 blasts is analyzed, and of these several KPIs are defined to create a Base Line for the quarry. Then this information is contrasted with data gathered collected by the team and is processed using different tools, through this is possible to contrast the data and evaluate the use of different technologies. Then, the impact of a new explosive is evaluated on 3 blasts. Through this, a New Design scenario allows a comparison between downstream process KPIs. Finally, the drill-to-mill approach seeks to digitally integrate the processes of drilling, blasting, loading, transport, and processing in the plant. It is expected that the information collected will allow the modeling of different scenarios and study their impact on the main production indicators, becoming a decision support tool for the management and administration of the daily operation of the quarry.
KW - Mine to Mill
KW - Mine Digitalization
KW - Bergbau
KW - Digitalisierung